22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

2) Operator Interface Terminal (OIT): The MCP shall be provided with an<br />

Operator Interface Terminal (OIT) display indicating the system<br />

configuration and providing maintenance operation controls. OIT units<br />

shall provide system status information for the associated system. The<br />

locations of BHS component graphics such as control station, photoelectric<br />

sensor and MCP shall match the BHS components in the field. OIT shall be<br />

able to display and track the hours of system operation and quantity of bags<br />

processed through the system. An 18” (minimum) square stainless steel<br />

static system map shall be provided adjacent to each OIT showing the<br />

system layout and location of equipment associated with motor control<br />

panel. OIT shall graphically display the baggage system or subsystem(s)<br />

layout associated with the motor control panel and each section of conveyor<br />

or device on the system layout shall show a color fill that is representative of<br />

the current status as follows:<br />

a) Green fill for conveyor on and running.<br />

b) Gray fill for conveyor on and stopped.<br />

c) Red fill for conveyor stopped due to E-Stop activation.<br />

d) Yellow fill for conveyor stopped due to bag jam condition.<br />

e) Blue fill for conveyor stopped due to motor overload.<br />

f) Cyan fill for conveyors stopped due to circuit breaker trip (if<br />

applicable).<br />

g) Magenta fill for conveyor stopped due to flow control.<br />

h) Brown fill for out of service conveyor.<br />

i) Light Green fill for conveyor that has a HMI override.<br />

j) Brown fill for conveyor that has a motor disconnect off.<br />

k) Black fill for auto-stopped conveyor (Timed Out).<br />

l) Bag Count.<br />

3) In addition to the graphic BHS layout status fill colors, provide status<br />

indication symbols on the system layout display screens for the following<br />

conditions:<br />

a) Green indicator (one per system controlled) - indicates "run"<br />

condition. Locate on bottom of all graphical display screens.<br />

b) Red indicator (one per E-STOP push-button) - indicates location at<br />

which an E-STOP push-button has been activated. Locate one<br />

symbol at each E-STOP location and turn symbol red only at<br />

activated E-STOP.<br />

c) Yellow indicator (one per bag jam photosensor) - indicates location at<br />

which a bag jam has occurred. Locate one symbol at each bag jam<br />

photosensor location and turn symbol yellow only at bag jam<br />

occurrence.<br />

d) White indicator (one per tall bag photosensor) - indicates location at<br />

which a tall bag jam has occurred. Locate one symbol at each tall bag<br />

photosensor location and turn symbol white only at tall bag jam<br />

occurrence.<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!