DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

SECTION 27 05 01 – BASIC TELECOMMUNICATION REQUIREMENTS<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section includes general administrative and procedural requirements for the Divisions 27 and<br />

Division 28 and Divisions 33 and 34 Telecommunications and Electronic Systems specification<br />

Sections.<br />

B. Related Sections:<br />

1. Division 01 Section “Summary.”<br />

2. Division 26 – Applicable Electrical Sections.<br />

3. Division 27 – Communications and Electronic Systems Sections.<br />

4. Division 28 – Electronic Safety and Security<br />

5. Division 33 – Wireless Communications Distribution System<br />

6. Division 34 – Baggage Handling Equipment<br />

C. The scope of work for the DCA Building Modifications to Accommodate In-Line Baggage<br />

Screening Project governed by this section includes telecommunications and electronic systems<br />

ancillary:<br />

1. Communications and Electronic Systems specified in Division 27.<br />

2. Electronic Safety and Security Systems specified in Division 28.<br />

3. Wireless Communications Distribution System specified in Division 33<br />

4. Related Baggage Handling Equipment specified in Division 34.<br />

D. The work shown in the Contract Drawings is diagrammatic in nature and the Contractor is<br />

responsible for providing final equipment arrangements, and locations.<br />

E. The work described in this Specification includes all labor, engineering, design work, materials,<br />

equipment and services necessary to install new, existing, and Owner-provided equipment.<br />

Materials or labor not specifically mentioned in this Specification, or not shown on the Contract<br />

Drawings, but required for proper installation, performance, and operation of the equipment or<br />

systems, shall be furnished and installed by the Contractor.<br />

F. The following administrative and procedural requirements are included in this Section to<br />

expand the requirements specified in Division 01.<br />

1.2 SUBMITTALS<br />

A. General: Follow the submittal procedures specified in Division 01 Section “Submittals.”<br />

Increase by the quantity listed below, the number of related shop drawings, product data, and<br />

samples submitted for Divisions 27, 28 and Division 34 Sections.<br />

BASIC TELECOMMUNICATION REQUIREMENTS 27 05 01 - 1