DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

SECTION 01 77 00 - PROJECT CLOSEOUT<br />

PART 1 - GENERAL<br />

1.1 RELATED DOCUMENTS<br />

A. Drawings, Contract Provisions, Special Provisions, Supplementary Conditions, and other<br />

Division 01 Specification Sections apply to this Section.<br />

1.2 SUMMARY<br />

A. This Section includes administrative and procedural requirements for Project closeout,<br />

including, but not limited to, the following:<br />

1. Substantial Completion.<br />

2. Final Completion and Acceptance.<br />

3. List of incomplete items.<br />

4. Warranties.<br />

5. Final cleaning.<br />

B. Related Sections include the following:<br />

1. Division 01 Section “Quality Requirements” for final requirements of the Warranty<br />

Manual.<br />

2. Division 01 Section "Photographic Documentation" for submitting Final Acceptance<br />

construction photographs and negatives.<br />

3. Division 01 Section "Project Record Documents" for submitting Record Drawings,<br />

Record <strong>Specifications</strong>, Record Product Data, and other Record Documents.<br />

4. Division 01 Section "Operation and Maintenance Data" for operation and maintenance<br />

manual requirements.<br />

5. Divisions 02 through 34 Sections for specific closeout and special cleaning requirements<br />

for products of those Sections.<br />

1.3 SUBSTANTIAL COMPLETION<br />

A. Definition: "Substantial Completion" is the stage in the progress of the work when COTR<br />

determines that all the Work, or a designated portion thereof, is sufficiently complete and<br />

functional according to the Contract Documents so that The Authority can occupy or utilize the<br />

Work for its intended use. The only remaining physical work shall be the completion of punch<br />

list work prior to Final Acceptance.<br />

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial<br />

Completion, complete the following. List items below that are incomplete in request.<br />

PROJECT CLOSEOUT 01 77 00 - 1