DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

F. Where system testing will cause outages or impacts, schedule testing activities so as to impose<br />

the least inconvenience on system users, Airport tenants, and other Airport agencies. This may<br />

require that the Contractor schedule testing during off shift hours in order to avoid conflicts<br />

with airport operations.<br />

G. Upon completion of the testing the Contractor shall submit a Test Report within 14 days to The<br />

Authority. The Test Report shall document the following:<br />

1. That the system extension meets all requirements of the Contract Documents.<br />

2. That system equipment meets all requirements of the Contract Documents.<br />

3. That all system functions and operations meet all requirements of the Contract<br />

Documents.<br />

H. Repair or replace malfunctioning units. Retest as specified above after repairs or replacements<br />

are made.<br />

3.7 CLEANING<br />

A. After completing system installation, including outlet fittings and devices, inspect exposed<br />

finish. Remove burrs, dirt, and construction debris. Repair damaged finish to match original<br />

finish.<br />

3.8 WIRE AND CABLE<br />

A. After installation and before termination all wiring and cabling shall be checked and tested to<br />

insure there are no grounds, opens or shorts on any conductors or shields.<br />

B. Visually inspect wire for faulty insulation prior to installation. Protect cable ends at all times<br />

with acceptable end caps except during termination.<br />

C. All wire and cabling shall be labeled at each end and within intermediate junction boxes. All<br />

labeling shall be identified on the Contractor’s as-built drawings. Submit labeling scheme for<br />

approval by the COTR prior to installation.<br />

PART 4 - CONTRACTOR’S QUALITY CONTROL REQUIREMENTS<br />

4.1 GENERAL<br />

A. Comply with applicable provisions of Division 01 Section - Quality Requirements for<br />

requirements for Contractor Quality Control Program.<br />

END OF SECTION 28 13 00<br />

ACCESS CONTROL AND ALARM MONITORING SYSTEM 28 13 00 - 9