22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM)10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 -CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

4) Field wiring.<br />

And the list shall indicate what percentage the subcontractor shall be responsible<br />

for its associated scope of work.<br />

c. After award of project, the approved control engineering team and the<br />

subcontractors for upper level control software and hardware, lower level control<br />

software and hardware, MCP and panel fabrications and field wiring shall not be<br />

replaced by others; their scope of work percentages shall not be changed.<br />

3. Installer: If the BHS is to be installed by an entity other than the Suppler, the Installer<br />

and its Supervisory personnel shall be listed on the proposal forms and shall comply with<br />

the following requirements. Qualified personnel shall install the equipment with factorytrained<br />

and certified supervisors. Supervisory personnel shall each have at least five (5)<br />

years of successful experience with the installation of airport BHS devices of the type<br />

specified herein.<br />

4. Electrical Installer: If the Electrical Installation is by an entity other than the Suppler, the<br />

Electrical Installer and its Supervisory personnel shall be listed on the proposal forms and<br />

shall comply with the following requirements. The Electrical Installer shall have not less<br />

than five (5) years continuous experience in the installation of similar systems, as<br />

specified herein; including systems utilizing PLC operated motor control panels and<br />

controls, as specified herein.<br />

1.9 DELIVERY, STORAGE AND HANDLING<br />

A. Delivery, storage and handling shall be in accordance with Division 01 Section “Product<br />

Requirements.”<br />

B. Methods of storage of conveyor materials shall protect the materials from weather, rust, air-born<br />

grit and other construction debris. Deteriorated equipment shall not be installed.<br />

1.10 PROJECT/SITE CONDITIONS<br />

A. The BHSC shall coordinate with the GC.<br />

1.11 SEQUENCING<br />

A. The BHSC shall coordinate with the GC.<br />

1.12 SCHEDULING<br />

A. The BHSC shall coordinate with the GC.<br />

1.13 WARRANTY<br />

BAGGAGE HANDLING EQUIPMENT 34 77 16 - 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!