22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

10. Contractor shall supply equipment, cabling, connectors, fixtures, and appurtenances<br />

required for a complete, operational, and fully functioning systems.<br />

1.5 SUBSTITUTIONS OF EQUIPMENT<br />

A. Where systems or equipment substitutions are proposed, Contractor shall submit the following<br />

to the COTR for approval before purchasing equipment or beginning installation in addition to<br />

the requirements of Division 01 Section “Product Requirements.”<br />

1. Complete catalog data proving that the proposed equipment and/or design are equal to or<br />

better than the equipment and design as specified.<br />

2. Compiled matrix showing performance features of specified product compared to:<br />

a. The performance criteria of the specifications and performance features of the<br />

specified product.<br />

b. Cost of proposed product versus specified product including differences in<br />

installation costs.<br />

B. Testing of Samples: When, in the COTR’s opinion, the submittal data or the manufacturer’s<br />

literature is insufficient for purposes of an evaluation, the individual or firm making the<br />

submittal shall arrange for sample items of equipment to be delivered to the COTR for his<br />

inspection and evaluation or the Contractor shall arrange for a field test of the equipment, as<br />

requested by the COTR.<br />

1.6 EQUIPMENT CERTIFICATION<br />

A. Underwriters Laboratories Inc.: All equipment, including accessories to the system and<br />

including all wire and cable, shall be listed by the Underwriters Laboratories product directory<br />

and/or “The Electrical Construction Materials List.”<br />

B. Applicable standards compliance: In addition to the UL listing, all communication equipment<br />

shall meet applicable portions of Federal Communications Commission (FCC), TIA/EIA,<br />

ANSI, and Bellcore for product performance and quality.<br />

C. Equipment to be certified by a Nationally Recognized Testing Laboratory (NRTL).<br />

1.7 STORAGE AND DELIVERY<br />

A. Equipment shall be delivered in original packages with labels intact and identification clearly<br />

marked.<br />

B. Equipment and components shall be protected from the weather, humidity, temperature<br />

variations, dirt, dust, or other contaminants.<br />

C. Equipment damaged prior to system acceptance shall be replaced at no cost to The Authority.<br />

BASIC TELECOMMUNICATION REQUIREMENTS 27 05 01 - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!