22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

D. Additional Photographs: COTR may issue requests for additional photographs, in addition to<br />

periodic photographs specified. Additional photographs will be paid for by Contract<br />

Modification and are not included in the Contract Price.<br />

1. Photographer will be given three days notice, where feasible.<br />

2. In emergency situations, photographer shall take additional photographs within 24 hours<br />

of request.<br />

3. Circumstances that could require additional photographs include, but are not limited to,<br />

the following:<br />

a. Special events planned at Project site.<br />

b. Immediate follow-up when on-site events result in construction damage or losses.<br />

c. Photographs to be taken at fabrication locations away from Project site. These<br />

photographs are not subject to unit prices or unit-cost allowances.<br />

d. Substantial Completion of a major phase or component of the Work.<br />

e. Extra record photographs at time of final acceptance.<br />

f. COTR's request for special publicity photographs.<br />

END OF SECTION 01 32 33<br />

PHOTOGRAPHIC DOCUMENTATION 01 32 33 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!