22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

L. Underground, Exterior-Wall Penetrations: Install cast-iron pipe sleeves. Size sleeves to allow<br />

for 1-inch annular clear space between raceway or cable and sleeve for installing mechanical<br />

sleeve seals.<br />

3.3 SLEEVE-SEAL INSTALLATION<br />

A. Install to seal exterior wall penetrations.<br />

B. Use type and number of sealing elements recommended by manufacturer for raceway or cable<br />

material and size. Position raceway or cable in center of sleeve. Assemble mechanical sleeve<br />

seals and install in annular space between raceway or cable and sleeve. Tighten bolts against<br />

pressure plates that cause sealing elements to expand and make watertight seal.<br />

3.4 FIRESTOPPING<br />

A. Apply firestopping to penetrations of fire-rated floor and wall assemblies for electrical<br />

installations to restore original fire-resistance rating of assembly.<br />

PART 4 - CONTRACTOR’S QUALITY CONTROL REQUIREMENTS<br />

4.1 GENERAL<br />

A. Comply with applicable provisions of Division 01 Section “Quality Requirements” for<br />

requirements for Contractor Quality Control Program.<br />

END OF SECTION 26 05 00<br />

COMMON WORK RESULTS FOR ELECTRICAL 26 05 00 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!