22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

B. Corrugated Stainless-steel Panels:<br />

1. Corrugated 0.0375-inch-thick, stainless-steel sheets in stainless-steel frame and to<br />

comply with details indicated.<br />

a. Corrugation pattern to match existing ticket-counters.<br />

C. Metal Reveals and Edges:<br />

1. Fabricate metal reveals for ticket counters from brake-formed, stainless-steel channels<br />

and barstock as indicated in Drawings. Drill for mounting screws 6 inches from ends of<br />

channels and not more than 24 inches o.c. Locate mounting screws at same heights for<br />

all channels. Provide hex-socket, wafer0head screws for mounting reveals.<br />

D. Fastener Materials: Unless otherwise indicated, provide the following:<br />

1. Stainless-steel Items: Type 304 stainless-steel fasteners.<br />

E. All stainless-steel materials shall be #4 brushed finish unless otherwise indicated.<br />

F. All Metal Materials: Remove burrs and ease edges to a radius of approximately 1/32 inch<br />

unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.<br />

2.5 GENERAL FINISH REQUIREMENTS<br />

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for<br />

recommendations for applying and designating finishes.<br />

2.6 STAINLESS-STEEL FINISHES<br />

A. Surface Preparation: Remove tool and die marks and stretch lines, or blend into finish.<br />

B. Brushed: No. 4.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Locate and place decorative formed metal items level and plumb and in alignment with adjacent<br />

construction. Perform cutting, drilling, and fitting required to install decorative formed metal.<br />

B. Use concealed anchorages where possible.<br />

C. Form tight joints with exposed connections accurately fitted together. Provide reveals and<br />

openings for sealants and joint fillers as indicated.<br />

DECORATIVE FORMED METAL 05 75 00 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!