22.01.2015 Views

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

Attachment 1: Specifications - Metropolitan Washington Airports ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DCA TERMINAL A IMPROVEMENTS (NEAR TERM) 10 AUGUST 2012<br />

TASK ORDER 03: LOBBY IMPROVEMENTS – PKG 4 - CURBSIDE CHECK-IN<br />

RONALD REAGAN WASHINGTON NATIONAL AIRPORT<br />

PROJECT DT1203<br />

1.5 SUBMITTALS<br />

A. General: Comply with the requirements of Division 01 Section “Submittals.”<br />

B. Additional submittal procedures are identified in Division 27 Section “Basic<br />

Telecommunication Requirements” and in the individual technical specification sections.<br />

C. Product Data Submittals:<br />

1. Submit catalog cut sheets, technical data sheets, manufacturer specifications and/or<br />

diagrams necessary to illustrate a product, material or system for some portion of the<br />

work. Product data literature is required on all items of material and equipment and<br />

should be clearly marked; identifying specific items proposed with a reference to the<br />

specification requirement the item is being submitted for.<br />

2. Product data shall include adequate descriptive literature and catalog cut sheets required<br />

for the Engineer to ascertain that the proposed equipment and materials comply with<br />

specification requirements.<br />

D. Shop Drawings:<br />

1. System Block Diagrams.<br />

2. System Riser Diagrams.<br />

3. Point-to-Point wiring diagrams.<br />

4. Floor plans detailing device locations.<br />

5. Equipment room layouts to scale.<br />

6. Installation of video surveillance system equipment in cabinets and racks, including<br />

wiring diagrams.<br />

7. Installation of video surveillance system equipment located in the equipment rooms,<br />

including wiring diagrams.<br />

8. Interconnection with Ethernet Switch including block diagrams and wiring diagrams.<br />

9. Details of interconnection to fiber optic backbone system.<br />

10. Prepare using the latest release of AutoCAD and deliver files to the COTR.<br />

VIDEO SURVEILLANCE SYSTEM 28 23 00 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!