12.07.2015 Views

PhD Final Thesis April 2013.pdf - Anglia Ruskin Research Online

PhD Final Thesis April 2013.pdf - Anglia Ruskin Research Online

PhD Final Thesis April 2013.pdf - Anglia Ruskin Research Online

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Thesis</strong> Keith Gale 20137.17.3 Interpretation for CSF2 – Accuracy of payments:Eta squared for CSF2 = -14.563²-14.563² + (60 + 60 – 2)Eta squared for CSF2 = 0.643An independent samples t-test was used to compare the ‘accuracy of payments’critical success factor scores for discrete verses framework projects. There was asignificant difference in scores for discrete projects (M=0.1073, SD=0.054) andframework projects (M=0.2397, SD=0.045), t (118) =-14.563, p=0.000). Themagnitude of the differences in the means is a large effect (0.643).7.17.4 Interpretation for CSF3 – Right first time:Eta squared for CSF3 = -2.971²-2.971² + (60 + 60 – 2)Eta squared for CSF3 = 0.070An independent samples t-test was used to compare the ‘right first time’ criticalsuccess factor scores for discrete verses framework projects. There was a significantdifference in scores for discrete projects (M=0.123, SD=0.098) and frameworkprojects (M=0.170, SD=0.072), t (118) =-2.971, p=0.004). The magnitude of thedifferences in the means was moderate (0.070).7.17.5 Interpretation for CSF4 – Health and safety inspections:Eta squared for CSF4 = -4.277²-4.277² + (60 + 60 – 2)Eta squared for CSF4 = 0.134An independent samples t-test was used to compare the ‘health and safety inspection’critical success factor scores for discrete verses framework projects. There was a160

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!