Adopted Budget FY 2018-2019
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
General Fund<br />
Sidewalk Construction<br />
www.mcallen.net/publicworks<br />
Mission<br />
Statement:<br />
Dedicated to keeping<br />
all pedestrian traffic<br />
safe through new<br />
construction and<br />
reconstruction of<br />
existing concrete<br />
sidewalks. This service<br />
shall be provided with<br />
a safe, professional,<br />
reliable, efficient, and<br />
eager to help<br />
disposition .<br />
Contact Us:<br />
Elvira Alonzo, Public<br />
Works Director<br />
4201 N. Bentsen Rd.<br />
McAllen, Texas 78504<br />
(956) 681-4000<br />
Department Summary<br />
Actual Adj. <strong>Budget</strong> Estimated <strong>Budget</strong><br />
Expenditure Detail: 16-17 17-18 17-18 18-19<br />
Personnel Services<br />
Salaries and Wages $ 132,597 $ 177,394 $ 139,280 $ 176,044<br />
Employee Benefits 45,850 67,463 67,463 67,089<br />
Supplies 29,344 30,132 30,132 30,132<br />
Other Services and Charges 40,423 33,992 33,992 35,825<br />
Maintenance 32,028 27,870 27,870 27,870<br />
Operations Subtotal 280,242 336,851 298,737 336,960<br />
Capital Outlay - 7,000 7,000 5,400<br />
Total Expenditures $ 280,242 $ 343,851 $ 305,737 $ 342,360<br />
PERSONNEL<br />
Exempt 1 1 1 1<br />
Non-Exempt 2 5 5 6<br />
Part-Time - - - -<br />
Total Positions Authorized 3 6 6 7<br />
MAJOR <strong>FY</strong> 18-19 GOALS<br />
1.) Construct 1.50 linear miles of sidewalk and 20 ADA required amenities per year.<br />
2.) Identify areas meeting criteria for federal funding to construct sidewalks around Metro routes.<br />
3.) Utilize concrete buggy to support the high volume of "small pour" work orders, by picking up from<br />
the plant, saving approximately $12,000 annually in small load surcharges.<br />
4.) Construct a concrete batch plant to mix concrete in-house for emergency and minor repairs.<br />
Description:<br />
The Sidewalk<br />
Construction<br />
Department is a<br />
division of Public<br />
Works. Through its<br />
staff of 6 employees<br />
the department<br />
properly installs and<br />
maintains pedestrian<br />
walkways along city<br />
roadways addressing<br />
safety issues to<br />
comply with applicable<br />
ADA requirements.<br />
Performance Measures<br />
Inputs:<br />
Actual Goal Estimated Goal<br />
<strong>FY</strong> 16-17 <strong>FY</strong> 17-18 <strong>FY</strong> 17-18 <strong>FY</strong> 18-19<br />
Number of full time employees 3 6 6 6<br />
Department Expenditures $ 280,242 $ 343,851 $ 305,737 $ 342,360<br />
Outputs:<br />
Sidewalk installation/repair work orders 183 200 170 170<br />
Concrete repair work orders completed 41 100 50 50<br />
Concrete repair - sq. ft. 2,995 8,000 1,900 1,900<br />
Sidewalk construction linear feet 5,887 7,920 3,320 3,320<br />
Sidewalk construction miles 1.37 1.50 1.00 1.00<br />
Number of ADA compliant ramps<br />
installed city facilities 19 20 10 10<br />
Effectiveness Measures:<br />
Number of work orders per 1000 residents 1.65 2.21 1.62 1.62<br />
Citizens rating for Ease of Walking as<br />
mode of transportation/mobility*<br />
59% 59% 59% 59%<br />
Citizens rating of Sidewalk<br />
Maintenance - Transportation Service*<br />
Efficiency Measures:<br />
73% 73% 73% 73%<br />
Cost per square foot - sidewalk construction $ 3.59 $ 4.41 $ 3.92 $ 4.39<br />
Department expenditures per capita $ 1.96 $ 2.37 $ 2.10 $ 2.32<br />
- 76 -