18.12.2018 Views

Adopted Budget FY 2018-2019

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Num.<br />

6.2.19<br />

Objective<br />

Ware Road: 5 Mile to FM1925 (Monte<br />

Cristo)<br />

Dept. / Time- Total Project Estimated <strong>Budget</strong> 18-<br />

Agency line Cost<br />

17-18 19<br />

Strategy 6.1: Provide state of the art service-delivery assets.<br />

Status - Rationale<br />

Engineering multi-yr. $654,830 $0 $0 Interlocal Agreement - Hidalgo County<br />

6.2.20<br />

6.3.1<br />

Improve Regional Bus service (Mission/<br />

Edinburg/ Pharr/ STC/ UTRGV)<br />

Initiate major Drainage Projects throughout<br />

City. Propose (passed) Bond funding,<br />

Drainage Fees (approved), Grants/FEMA<br />

to fund complete Plan.<br />

Transit 5 yrs. Program Program Program<br />

Commission<br />

Engineering<br />

$47M (est.) $0 TBD<br />

Overall:<br />

multiyear<br />

Voter approved (<strong>2018</strong>) Drainage Bond<br />

Projects (below)<br />

below below below below below<br />

6.3.2<br />

<strong>2018</strong> Bond Project: Martin Ave & N. 6th to<br />

Engineering<br />

Mulitayear<br />

Blueline<br />

$1,176,000 $0 $1,176,000<br />

6.3.3<br />

<strong>2018</strong> Bond Project: 4th St. & Sunflower<br />

Engineering<br />

Mulitayear<br />

Ave<br />

$1,232,000 $0 $1,232,000<br />

6.3.4 <strong>2018</strong> Bond Project: Quamasia Ave @ 11th Engineering Mulitayear<br />

$420,000 $0 $420,000<br />

6.3.5<br />

<strong>2018</strong> Bond Project: Highland Ave @ 7 1/2<br />

Engineering<br />

Mulitayear<br />

St.<br />

$207,200 $0 $207,200<br />

6.3.6<br />

<strong>2018</strong> Bond Project: Dove Ave from N. 6th<br />

Engineering<br />

Mulitayear<br />

to N. 2nd<br />

$1,512,000 $0 $1,512,000<br />

6.3.7<br />

<strong>2018</strong> Bond Project: Primrose Ave @<br />

Engineering<br />

Mulitayear<br />

Bicentennial Blvd.<br />

$134,400 $0 $134,000<br />

6.3.13<br />

<strong>2018</strong> Bond Project: Northwest Blueline<br />

regrade / expansion<br />

Engineering<br />

6.3.8 <strong>2018</strong> Bond Project: Marigold Ave Engineering Mulitayear<br />

6.3.9 <strong>2018</strong> Bond Project Vine Ave @ 48th St Engineering Mulitayear<br />

6.3.10 <strong>2018</strong> Bond Project: 43rd St bypass Engineering Mulitayear<br />

<strong>2018</strong> Bond Project: 2nd Street & Byron<br />

6.3.11 Engineering<br />

Mulitayear<br />

Nelson<br />

6.3.12 <strong>2018</strong> Bond Project: 12th @ Esperanza Ave Engineering Mulitayear<br />

Mulitayear<br />

6.3.21<br />

<strong>2018</strong> Bond Project: MS4 Storm water<br />

Quality Monitoring Program<br />

Engineering<br />

6.3.14 <strong>2018</strong> Bond Project: Harvey @ N. Main Engineering Mulitayear<br />

6.3.15 <strong>2018</strong> Bond Project: E. Tamarack Ave. Engineering Mulitayear<br />

6.3.16 <strong>2018</strong> Bond Project: Iris Ave @ Cynthia St. Engineering Mulitayear<br />

<strong>2018</strong> Bond Project: Gardenia Ave @ 25 1/2<br />

6.3.17 Engineering<br />

Mulitayear<br />

St.<br />

<strong>2018</strong> Bond Project: Northwest Regional<br />

6.3.18 Engineering<br />

Mulitayear<br />

Detention Facility<br />

<strong>2018</strong> Bond Project: Bicentennial Bridge<br />

6.3.19 Engineering<br />

Mulitayear<br />

Replacement - Harvey, Tamarack<br />

6.3.20 <strong>2018</strong> Bond Project: Pump Bypass Station Engineering Mulitayear<br />

Mulitayear<br />

$50,400 $0 $50,400<br />

$131,040 $0 $131,040<br />

$470,400 $0 $470,400<br />

$1,120,000 $0 $1,120,000<br />

$137,290 $0 $137,290<br />

$2,800,000 $0 $2,800,000<br />

$13,774 $0 $13,774<br />

$28,000 $0 $3,000<br />

$98,560 $0 $10,560<br />

$123,200 $0 $13,200<br />

$5,152,000 $0 $552,000<br />

$5,600,000 $0 $6,000<br />

$84,000 $0 $9,000<br />

$67,200 $0 $7,200<br />

6.3.22 Pecan @ N. 27th Drainage Improvements Engineering 1 yr $238,515 $8,080 $50,000<br />

6.3.23<br />

Westway Heights Drainage Improvements<br />

(major new regional detention project)<br />

Strategy 6.3: Provide excellent stormwater management for all businesses and residents.<br />

Engineering 2 yr $4,307,326 $46,898 $4,189,409<br />

Improve regional transportation services by<br />

integrating intercity routes; increase ridership<br />

through regional routes with high density<br />

Bond issues PASSED <strong>2018</strong> - Consultant<br />

contracts approved with all under design.<br />

Various funding sources to pay for all projects.<br />

For updated project info, go to --<br />

http://www.mcallen.net/bond<strong>2018</strong>/<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

Project in Engineering/Design - late <strong>2018</strong>. Next<br />

step: Out to bid.<br />

FEMA Hazard Mitigation Grant Program (HMGP)<br />

project; 75%/25% Federal/Local<br />

FEMA Hazard Mitigation Grant Program (HMGP)<br />

project; 75%/25% Federal/Local<br />

6.3.24 Kennedy Avenue Drainage Improvements Engineering 2 yr. $844,055 $30,575 $813,480<br />

FEMA Hazard Mitigation Grant Program (HMGP)<br />

project; 75%/25% Federal/Local<br />

6.3.25 El Rancho - Santa Cruz S/D Drainage Engineering 1 yr. $635,029 $22,606 $358,448<br />

FEMA Hazard Mitigation Grant Program (HMGP)<br />

project; 75%/25% Federal/Local UNDER<br />

CONSTRUCTION<br />

N. 16th St. at Ivy Ave. Drainage<br />

6.3.26<br />

Improvements<br />

Engineering <strong>2018</strong> $61,779 $0 $61,779 CDBG Funded, <strong>FY</strong> 17-18<br />

N. Main St. at Cedar Ave. Drainage<br />

6.3.27<br />

Improvements<br />

Engineering <strong>2018</strong> $219,292 $0 $219,292 CDBG Funded, <strong>FY</strong> 17-18<br />

N. 5th St. at Hackberry Ave. Drainage<br />

6.3.28<br />

Improvements<br />

Engineering <strong>2018</strong> $130,015 $0 $130,015 CDBG Funded, <strong>FY</strong> 17-18<br />

Continually remove weed/tree growth and Public<br />

6.3.29<br />

garbage in open drainage facilities<br />

Works<br />

ongoing Program Program Program To maintain water flow/ reduce flooding<br />

Public<br />

6.3.30 Reprofile main drain ditches (wider/deeper) Works/ ongoing Program Program Program To increase water flow/ reduce flooding<br />

Engineering<br />

Improve access to existing drainage channels to<br />

Drainage Channel Maintenance Access Public<br />

6.3.31 ongoing Program Program Program facilitate maintenance activities necessary for<br />

Improvements<br />

Works<br />

proper channel function<br />

- xxxiii -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!