Adopted Budget FY 2018-2019
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Mission<br />
Statement:<br />
Transmission &<br />
Distribution<br />
Department is<br />
dedicated to providing<br />
uninterrupted<br />
customer service. In<br />
doing so, we will<br />
continuously maintain<br />
the water system and<br />
provide the customer<br />
service we are certified<br />
to provide at all times.<br />
Contact Us:<br />
Jose Solis<br />
Director of Water<br />
Systems<br />
2501 W. Expressway<br />
83<br />
McAllen, TX 78503<br />
(956) 681-1700<br />
Description:<br />
The Transmission and<br />
Distribution<br />
Department maintain<br />
the water system of<br />
the City of McAllen.<br />
Such services include,<br />
but are not limited to;<br />
water lines, water<br />
meter, water valves,<br />
and fire hydrants. We<br />
also tap into the<br />
existing water lines for<br />
new customers and<br />
new developments.<br />
Other services<br />
provided are the<br />
Backflow Cross-<br />
Connection Control<br />
Program, which<br />
includes the testing<br />
and maintenance of<br />
city owned backflows.<br />
Department Summary<br />
Water Fund<br />
Transmission & Distribution<br />
www.mcallen.net/mpu/departments/transmissionanddistribution<br />
Actual Adj. <strong>Budget</strong> Estimated <strong>Budget</strong><br />
Expenditure Detail: 16-17 17-18 17-18 18-19<br />
Personnel Services<br />
Salaries and Wages $ 1,504,022 $ 1,614,379 $ 1,441,790 $ 1,598,403<br />
Employee Benefits 442,966 535,302 535,302 528,837<br />
Supplies 27,319 40,000 33,000 40,000<br />
Other Services and Charges 54,760 73,950 69,100 223,950<br />
Maintenance 116,143 251,500 211,500 251,500<br />
Operations Subtotal 2,145,211 2,515,131 2,290,692 2,642,690<br />
Capital Outlay 10,407 67,916 23,450 43,900<br />
Total Expenditures $ 2,155,618 $ 2,583,047 $ 2,314,142 $ 2,686,590<br />
PERSONNEL<br />
Exempt 3 3 3 3<br />
Non-Exempt 42 44 44 44<br />
Part-Time - - - -<br />
Total Positions Authorized 45 47 47 47<br />
1.) Southeast Water Transmission Line - Dicker Road. (6.4.2)<br />
2.) Waterline replacement at Balboa Acres. (6.4.5)<br />
3.) Continue with TWUA Certification for the Transmission & Distribution employees.<br />
4.) Continue working on JBS Program to replace old meters and test large meters annually.<br />
5.) Enforce and maintain Backflow Cross-Connection Program5<br />
6.) Continue flushing program to prevent bacteriological contamination.<br />
Performance Measures<br />
Inputs:<br />
Actual Goal Estimated Goal<br />
<strong>FY</strong> 16-17 <strong>FY</strong> 17-18 <strong>FY</strong> 17-18 <strong>FY</strong> 18-19<br />
Number of full time employees 45 47 47 47<br />
Department expenditures $ 2,155,618 $ 2,583,047 $ 2,314,142 $ 2,686,590<br />
Outputs:<br />
Number of New Taps 638 850 800 700<br />
Number of complaints/requests completed 14,143 3,300 12,000 10,000<br />
Number of service orders completed, i.e., tests, raise, relocate, 5,147 replace meters, 4,500etc.<br />
4,500 7,500<br />
Total workload 19,928 8,650 18,728 12,000<br />
Effectiveness Measures:<br />
Meters exchanged (JBS Report) 502 1,200 300 2,000<br />
Main and service line repairs 517 300 587 400<br />
Water lines replaced (feet) N/A N/A N/A N/A<br />
Fire hydrants replaced 30 30 30 30<br />
Efficiency Measures:<br />
MAJOR <strong>FY</strong> 18-19 GOALS<br />
Meters exchanged (average/month) 60 100 110 100<br />
Meters installed (average/month) 52 100 70 75<br />
Requests/complaints completed monthly 1,000 800 1,000 750<br />
Water lines maintained (miles) 802 725 850 802<br />
Fire hydrants maintained 4,041 4,100 4,200 4,041<br />
Department expenditures per capita $ 15.07 $ 15.20 $ 15.16 $ 15.62<br />