19.11.2014 Views

Türkiye'de Yazılım Üreticilerinin Yetkinlik Düzeyi, Firmaların ve ...

Türkiye'de Yazılım Üreticilerinin Yetkinlik Düzeyi, Firmaların ve ...

Türkiye'de Yazılım Üreticilerinin Yetkinlik Düzeyi, Firmaların ve ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16 Referanslar<br />

[1]<br />

[2]<br />

[3]<br />

[4]<br />

[5]<br />

[6]<br />

[7]<br />

[8]<br />

[9]<br />

[10]<br />

[11]<br />

[12]<br />

[13]<br />

[14]<br />

[15]<br />

[16]<br />

Abe, J., Sakamura, K., Aiso, H., (1979) “An analysis of software project failure”, In:<br />

Proceedings of the Fourth Software Engineering Conference, pp. 378-385.<br />

Aggarwal, R., Rezaee, Z., (1996) “Total quality management for bridging the expectations gap in<br />

systems de<strong>ve</strong>lopment”, International Journal of Project Management, Vol. 14, No.2, pp. 115-<br />

120.<br />

Ahire, S.L., (1996) “TQM age <strong>ve</strong>rsus quality: an empirical in<strong>ve</strong>stigation”, Production and<br />

In<strong>ve</strong>ntory Management Journal 37 (1) pp.18-23.<br />

Ahlemann, F., Teuteberg, F., Vogelsang, K., (2009) “Project management standard-Diffusion<br />

and application in Germany and Switzerland”, International Journal of Project Management 27,<br />

292-303.<br />

Akçaoğlu, E., (2006) “Türk Firmalarının Dış Yatırımları: Saikler <strong>ve</strong> Stratejiler”, TBB Yayın no:<br />

241, Ankara 2006.<br />

Akgün, A.E, Byrne, J.C., Lynn, G.S., Keskin H., (2007) “Team stressors, management support,<br />

and project and process outcomes in new product de<strong>ve</strong>lopment projects”, Technovation 27, pp.<br />

628-639.<br />

Akyos, M. (2005) “Sürekli Yenilikçilik (İnovasyon) için Teknolojik Yetenek Değerlendirilmesi<br />

(Technology Audit)”, Aralık 2005.<br />

<br />

Albrecht, A.J., Gaffney, J.E., (1983) “Software Function, Source Lines of Code, and<br />

De<strong>ve</strong>lopment Effort Prediction: A Software Science Validation”, IEEE Transactions on Software<br />

Engineering, SE-9, Nr.6.<br />

Alderman, A. Panossian, V. (2005), “Demystifying Value Creation Through “Pull” Marketing<br />

Strategies in the Power Supply Markets,” IAPD (International Assocation for Product<br />

De<strong>ve</strong>lopment), Learning Innovation, June 9, 2005.<br />

Al-Jibouri, S.H., (2003) “Monitoring systems and their effecti<strong>ve</strong>ness for project cost control in<br />

construction”, International Journal of Project Management 21 (2), 145-154.<br />

Allan, G., (1997) “Configuration management and its impact on businesses that use computer<br />

platforms”, International Journal of Project Management, Vol. 15, 5, pp.321-330.<br />

Allen, T.J., (1997) “Organizational Structure De<strong>ve</strong>lopment”, The International Center for<br />

Research on the Management of Technology, Massachusetts Institute of Technology, Sloan WP<br />

# 3989.<br />

Anchordoguy, M., (2000) “Japan’s software industry: a failure of institutions?”, Research Policy<br />

29 (2000) 391-408<br />

ANSI/IEEE Std. 1042-1987, “IEEE Guide to Software Configuration Management”, Technical<br />

Committee on Software Engineering of Computer Society of IEEE, 10 Eylül 1987.<br />

Anttila, J., (1992) “Standardization of quality management and quality assurance: a project<br />

viewpoint), International Journal of Project Management, Vol. 10, Issue 4, pp. 208-212.<br />

Archibald, R. D., (2004) “State of the art of the project management”, PMI-Sao Paulo 4 th<br />

International Seminar on Project Management, Maturity in Project Management, Sao Paulo,<br />

317

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!