19.11.2014 Views

Türkiye'de Yazılım Üreticilerinin Yetkinlik Düzeyi, Firmaların ve ...

Türkiye'de Yazılım Üreticilerinin Yetkinlik Düzeyi, Firmaların ve ...

Türkiye'de Yazılım Üreticilerinin Yetkinlik Düzeyi, Firmaların ve ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

[254]<br />

[255]<br />

[256]<br />

94(5), ss.1002-1037.<br />

Romer, P.M., (1990) “Endogenous Technological Change”, Journal of Political Economy, 98(5),<br />

S71-S101.<br />

Roper, S., Grimes, S., (2005) “Wireless Valley, Vilicon Wadi and Digital Island-Helsinki, Tel<br />

Aviv <strong>ve</strong> Dublin and the ICT Global Production Network Ability Tests: The Role of Values and<br />

Test Taking Attitudes”, ISBN No. 1 85449 695 6.<br />

Roselino, J. E., Diegues, A. C., (2009). Projeto Perspectivas Do In<strong>ve</strong>stimento No Brazil,<br />

BLOCO: Economia Do Conhecimento, Sistema Productivo: Tecnologias De Informação e<br />

Conunicação, Coordenação: Paulo Bastos Tigre, Documento Setorial: Software, PIB<br />

(Perspectivas do In<strong>ve</strong>stimento no Brasil).<br />

[257] Rowe, William D., (1988) “An Anatomy of Risk”, Malabar, Florida: Robert E. Krieger<br />

[258] Royce, W., (1999) “Software Project Management”, Addison Wesley, Reading.<br />

[259]<br />

[260]<br />

[261]<br />

[262]<br />

Ruby P. Lee and Q. Chen, (2009) “The immediate impact of the new product introductions on<br />

stock price: The role of firm resources and size”, The Journal of Product Innovation<br />

Management, 26: 97-107.<br />

Saiedian, H., Dale, R., (2000) “Requirements engineering: making the connection between the<br />

software de<strong>ve</strong>loper and customer”, Information and Software Technology 42:419-428.<br />

Sanders, N.R., Locke, A., Moore, C.B. and Autry, C.W. (2007) “A multidimensional framework<br />

for understanding outsourcing arrangements,” Journal of Supply Chain Management, Vol.43<br />

No.4, pg.3, Fall 2007.<br />

Sanders, N.R., Premus, R., (2005) “Modeling the Relationship Between Firm IT Capability,<br />

Collaboration, and Performance”, Journal of Business Logistics, Vol. 26, No. 1, 1-23.<br />

[263] Sarıhan, H. İ., (1998) “Rekabette Başarının Yolu Teknoloji Yönetimi”, Desnet Yayınları, Gebze.<br />

[264]<br />

[265]<br />

Saxenian, A.L., (2003) “Global Software from Emerging Markets: An Engine for Growth?”<br />

London Business School.<br />

Schoenecker, T. <strong>ve</strong> Swanson L., (2002) “Indicators Determining FTC-Assessing a firms’<br />

technological capability,” IEEE Transactions on Engineering Management, Vol. 49, No.1,<br />

February.<br />

[266] Scott, JE, (1998) “Organizational knowledge and the Internet”, Decision Support Systems; 3-17.<br />

[267]<br />

[268]<br />

[269]<br />

[270]<br />

[271]<br />

Shepperd, M., Schofield C., (1997) “Estimating Software Project Effort Using Analogies”, IEEE<br />

Transactions of Software Engineering, Vol. 23, No. 12.<br />

Shumate, K. Snyder, T., (1994) “Software project reporting: management, measurement, and<br />

process impro<strong>ve</strong>ment”, Annual International Conference on Ada. ACM Press, Baltimore, pp.41-<br />

45.<br />

Singh, R., (1995) “Introduction to International Standard ISO/IEC 12207: Software Life Cycle<br />

Processes”, Tutorial Slides.<br />

Software Engineering Institute (SEI), Capability Maturity Model Integration (CMMI), <strong>ve</strong>rsion<br />

1.2. .<br />

Song, X.M., Montoya-Weiss M.M., Schmidt J.B., (1997) “Antecedents and consequences of<br />

cross-functional cooperation: a comparison of R&D, manufacturing and marketing perspecti<strong>ve</strong>”,<br />

331

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!