27.06.2013 Views

Proceedings of the 12th European Conference on Knowledge ...

Proceedings of the 12th European Conference on Knowledge ...

Proceedings of the 12th European Conference on Knowledge ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Lila Rajabi<strong>on</strong> and Jafar Zanganeh<br />

Figure 1.0 Pareto graph <str<strong>on</strong>g>of</str<strong>on</strong>g> risks priority number <str<strong>on</strong>g>of</str<strong>on</strong>g> Barez Industrial Group knowledge management:<br />

11. Limitati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> research<br />

During this research we faced several limitati<strong>on</strong>s and problems including lack <str<strong>on</strong>g>of</str<strong>on</strong>g> accurate and clear<br />

understanding <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> behalf <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> organizati<strong>on</strong> superior managers. The<br />

organizati<strong>on</strong> superior managers didn’t have an accurate understanding <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management<br />

and <str<strong>on</strong>g>the</str<strong>on</strong>g> project management. O<str<strong>on</strong>g>the</str<strong>on</strong>g>r problems were lack <str<strong>on</strong>g>of</str<strong>on</strong>g> tolerance and enough time for completing<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> designed questi<strong>on</strong>naires and participating in <str<strong>on</strong>g>the</str<strong>on</strong>g> brain storming meetings. Also <strong>on</strong>e <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

limitati<strong>on</strong>s we faced with during project was competiti<strong>on</strong> with o<str<strong>on</strong>g>the</str<strong>on</strong>g>r projects such as EFQM project<br />

which c<strong>on</strong>sumed most <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> organizati<strong>on</strong> managers' time. This study focuses <strong>on</strong> <strong>Knowledge</strong><br />

management, a new technology in <str<strong>on</strong>g>the</str<strong>on</strong>g> Informati<strong>on</strong> Technology field. Research is required whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

results <str<strong>on</strong>g>of</str<strong>on</strong>g> this research could be generalized to o<str<strong>on</strong>g>the</str<strong>on</strong>g>r companies around <str<strong>on</strong>g>the</str<strong>on</strong>g> globe or a specific regi<strong>on</strong>.<br />

12. C<strong>on</strong>clusi<strong>on</strong><br />

Today, managers have fully realized <str<strong>on</strong>g>the</str<strong>on</strong>g> importance <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge and knowledge management in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

organizati<strong>on</strong>s, and most <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g>m are looking for executing <str<strong>on</strong>g>the</str<strong>on</strong>g> knowledge management system in <str<strong>on</strong>g>the</str<strong>on</strong>g>ir<br />

organizati<strong>on</strong>s. However, <str<strong>on</strong>g>the</str<strong>on</strong>g>y worry that <str<strong>on</strong>g>the</str<strong>on</strong>g>y can not execute <str<strong>on</strong>g>the</str<strong>on</strong>g> said system in <str<strong>on</strong>g>the</str<strong>on</strong>g>ir organizati<strong>on</strong><br />

and <str<strong>on</strong>g>the</str<strong>on</strong>g>refore knowledge management fails in <str<strong>on</strong>g>the</str<strong>on</strong>g>ir organizati<strong>on</strong>. Analyzing, classifying and being<br />

aware <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> most important effective factors in failure <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management projects in <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

organizati<strong>on</strong>s would remarkably influence manner <str<strong>on</strong>g>of</str<strong>on</strong>g> facing, designing and carrying out knowledge<br />

management projects. Since, according to <str<strong>on</strong>g>the</str<strong>on</strong>g> majority <str<strong>on</strong>g>of</str<strong>on</strong>g> researchers, knowledge management in<br />

today's world is an issue which all organizati<strong>on</strong> are forced to use it in order to survive, <str<strong>on</strong>g>the</str<strong>on</strong>g>refore<br />

research <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> ground <str<strong>on</strong>g>of</str<strong>on</strong>g> causes <str<strong>on</strong>g>of</str<strong>on</strong>g> failure and risks in knowledge management projects seems<br />

necessary. By being aware <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> main causes <str<strong>on</strong>g>of</str<strong>on</strong>g> failure in knowledge management projects, <str<strong>on</strong>g>the</str<strong>on</strong>g> rate<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> failure would be decreased to a high degree. Therefore, in this research, first we reviewed risk<br />

process and use <str<strong>on</strong>g>of</str<strong>on</strong>g> risk management techniques such as FMEA and PMBOK, and <str<strong>on</strong>g>the</str<strong>on</strong>g>n, by<br />

c<strong>on</strong>sidering <str<strong>on</strong>g>the</str<strong>on</strong>g> researchers' opini<strong>on</strong>s in this ground, using <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>cept <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management<br />

and c<strong>on</strong>sidering <str<strong>on</strong>g>the</str<strong>on</strong>g> live document <str<strong>on</strong>g>of</str<strong>on</strong>g> FMEA, we took measures to provide a model for evaluating,<br />

c<strong>on</strong>trolling and supervising knowledge management risks. In <str<strong>on</strong>g>the</str<strong>on</strong>g> presented model in this research,<br />

most <str<strong>on</strong>g>of</str<strong>on</strong>g> requirements <str<strong>on</strong>g>of</str<strong>on</strong>g> FMEA, PMBOK and knowledge management have been covered and met. In<br />

this research, while studying knowledge management throughly, failure causes <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge<br />

management project <str<strong>on</strong>g>of</str<strong>on</strong>g> Barez Industrial Group were analyzed. Studying <str<strong>on</strong>g>the</str<strong>on</strong>g> results showed that lack<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> support and commitment <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> behalf <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> superior management, incorrect arrangement and<br />

improper selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management team members, inappropriate planning and predicting<br />

for executing <str<strong>on</strong>g>the</str<strong>on</strong>g> project, not allocating separate budget to <str<strong>on</strong>g>the</str<strong>on</strong>g> knowledge management project,<br />

organizati<strong>on</strong>al culture, lack <str<strong>on</strong>g>of</str<strong>on</strong>g> cooperati<strong>on</strong> <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> behalf <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> employees , and <str<strong>on</strong>g>the</str<strong>on</strong>g> organizati<strong>on</strong>al<br />

resistance against change were <str<strong>on</strong>g>the</str<strong>on</strong>g> main failure causes <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management project.<br />

13. Future research<br />

C<strong>on</strong>sidering that <str<strong>on</strong>g>the</str<strong>on</strong>g> designed model is a live document for any project and it shall be c<strong>on</strong>sidered as a<br />

holy book <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> project, in <str<strong>on</strong>g>the</str<strong>on</strong>g> next research we would look for a new model <str<strong>on</strong>g>of</str<strong>on</strong>g> risk c<strong>on</strong>trol plan, so<br />

that, using <str<strong>on</strong>g>the</str<strong>on</strong>g> findings resulted from <str<strong>on</strong>g>the</str<strong>on</strong>g> presented FMEA-PMBOK model in this research, we may<br />

c<strong>on</strong>trol risks <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge management projects sec<strong>on</strong>d by sec<strong>on</strong>d. RCP model would be able to<br />

design a set <str<strong>on</strong>g>of</str<strong>on</strong>g> acti<strong>on</strong>s and measures for placing <str<strong>on</strong>g>the</str<strong>on</strong>g> project risks in an acceptable level.<br />

823

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!