03.08.2013 Views

OPERATION MANUAL CompoBus/S

OPERATION MANUAL CompoBus/S

OPERATION MANUAL CompoBus/S

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operations Checklist Section 3-5<br />

Inserting and Removing<br />

Cable Connectors<br />

3-5 Operations Checklist<br />

CS-series,<br />

C200HX/C200HG/<br />

C200HE-(Z)E, and<br />

C200HS Master<br />

Units<br />

70<br />

and press the cover straight into the connector plug. There should not be<br />

any gap between the cover and plug.<br />

The sensor cable can be inserted into the Sensor Terminal once the cable<br />

connector has been attached.<br />

Inserting the Cable Connector<br />

Position the cable connector so that Terminal 1 faces you and push the connector<br />

into the Sensor Terminal until it clicks into place.<br />

Removing the Cable Connector<br />

To remove the cable connector, first pull out the lock lever and then remove<br />

the cable connector, as shown in the following diagram.<br />

Lock lever<br />

Go through the items in the following checklist before turning ON the Units in<br />

the <strong>CompoBus</strong>/S System. All of the checks should be answered “Yes.”<br />

Item Check Answer<br />

Switch settings Has the Master’s Special I/O Unit unit number been set?<br />

(Refer to 4-1-2 Switch Settings for details.)<br />

Yes No<br />

Has the node number been set with pin 1 of the DIP switch?<br />

(Refer to 4-1-2 Switch Settings for details.)<br />

Yes No<br />

Has the communications mode been set with pin 2 of the DIP switch?<br />

(Refer to 4-1-2 Switch Settings for details.)<br />

Yes No<br />

Are pins 3 and 4 of the DIP switch all set to OFF? Yes No

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!