14.10.2015 Views

100-Metodos-de-Qualidade-Total

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DATA COLLECTION, ANALYSIS AND DISPLAY 195<br />

Example<br />

A company is monitoring the number of <strong>de</strong>fective bindings of a report. A<br />

binding is <strong>de</strong>fective when the contents overlap the outer covers. A sample<br />

of <strong>100</strong> reports is taken on a daily basis and the figures are as follows:<br />

Lot no.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

<strong>Total</strong><br />

Defective lapping<br />

(np)<br />

5<br />

6<br />

5<br />

4<br />

2<br />

1<br />

2<br />

o<br />

2<br />

3<br />

4<br />

3<br />

4<br />

3<br />

2<br />

3<br />

2<br />

4<br />

3<br />

2<br />

60<br />

Sample size = <strong>100</strong><br />

'i.np = 60<br />

np = 60/20 = 3<br />

P = 3/<strong>100</strong> = 0.03<br />

3vnp = 5.20<br />

V1 -p = 0.985<br />

3vnp x V1 -p = 5.12<br />

UCL = 3 + 5.12 = 8.12<br />

LCL = 3- 5.12 = 0<br />

The control chart shows that the process is un<strong>de</strong>r statistical control (Figure 1<br />

on page 196).<br />

Reference<br />

Mal Owen (1989b) SPC and Continuous Improvement. London: IFS Publications.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!