RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

The reclamation area will be filled up to +2.00 LAT. Then, a suitable capping layer and pavement will be used on<br />

top of the fill level around 2.00 m thick. Land-based equipment will be used to spread and level the delivered<br />

materials.<br />

Bunds<br />

In order to retain the dredging material in the reclamation area, bunds will be constructed around each of the<br />

reclamation areas prior to start filling.<br />

RECLAMATION BUNDS<br />

Figure 135: Proposed reclamation bunds<br />

The proposed work sequence is the following:<br />

• Rubble mound will start from the landside and will provide a permanent limit for the reclamation area at the<br />

west end.<br />

• TSHD will be used to dredge the trench if necessary, in order to start construction of the vertical breakwater<br />

which will help to CSD to work in adverse weather conditions within the basin.<br />

• Permanent reclamation bunds are to be constructed as shown in the figure, parallel to the berth alignment (west<br />

to east) and perpendicular to the shoreline at the east end.<br />

• Dredging will be carried out at the basin and turning circle area, and material will be pumped to reclamation<br />

area.<br />