RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR DEVELOPMENT OF<br />

COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

5<br />

Nº Activity<br />

Handling of<br />

hazardous wastes<br />

6 Water Resources<br />

Relevant<br />

Environmental<br />

Components to be<br />

affected<br />

Human safety and<br />

property loss<br />

Water<br />

Scarcity/Pollution<br />

<br />

<br />

Likely Impacts<br />

Fire accidents due to hazardous material<br />

handling<br />

Impacts to surface water bodies<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Proposed Mitigation Measures<br />

General refuse generated on-site will be<br />

collected in waste skips and separated from<br />

construction waste.<br />

Burning of refuse at construction sites will be<br />

prohibited.<br />

All control measure will be taken to avoid the<br />

contamination of groundwater during<br />

construction phase<br />

Adequate safety measures standards will be<br />

adopted<br />

Construction site will be secured by fencing<br />

with controlled/limited entry points.<br />

Hazardous materials such as lubricants, paints,<br />

compressed gases, and varnishes etc., will be<br />

stored as per the prescribed/approved safety<br />

norms.<br />

Construction site will be secured by fencing<br />

with controlled/ limited entry points<br />

Medical facilities including first aid will be<br />

available for attending to injured workers.<br />

Positive isolation procedures will be adhered<br />

Hazardous wastes will be disposed through<br />

approved TNSPCB/CPCB vendors.<br />

Avoid/minimise the loss during conveyance<br />

Optimized utilization of the water<br />

Care will be taken to prevent the runoff from<br />

the construction site to the nearby natural<br />

streams, if any<br />

Responsible Agency for<br />

Implementation<br />

<strong>Port</strong> Authority /<br />

Contractor/<br />

<strong>Port</strong> Authority /<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 166<br />