RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

The following is a preliminary environmental budget plan to address all environmental management<br />

requirements., the budgetary provision required to achieve this will be naturally high. Some of the key areas<br />

identified are the following:<br />

• Environmental (terrestrial and marine) monitoring in both construction and operation phase Monitoring of<br />

Shoreline changes in Colachel-<strong>Enayam</strong> coast in both construction and operation phase<br />

• Water & wastewater management. Solid waste management.,<br />

• Groundwater development at Project Area. Focused water supply augmentation study in the 5 km study<br />

area. Storm water management and Rainwater harvesting is also planned<br />

• Employment for solid waste management using Women Self Help Groups (SHG)-<br />

• Fishermen who lost livelihood opportunities will be given preference in providing employment, scavenger<br />

boat operations. STP operators for the streams will be from those groups who lost Livelihood opportunities<br />

• Rainwater harvesting, desiltation using silt traps, solid waste removal using waste trap, flow tank for spill<br />

over, collection tank, sump from where the water will be pumped to the various locations and also for the<br />

excess water to be drained to the sea by a naturally controlled mechanism.<br />

• Sanitation facility at new fishing harbour for the entire fishing village <strong>Enayam</strong>. Bathing rooms.<br />

6.4.1. Environmental budget<br />

The budgetary preliminary estimate for Environmental Management for proposed port, road and railway<br />

alignment during construction phase is Rs 292Million (29 Crores) and the annual budgetary estimate during<br />

operational phase is Rs 20 Million<br />

The breakup of annual environmental management cost of port and other land ward infrastructure such as road<br />

and rail alignment are given separately<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 177 177<br />

www.tamilri.com