RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

This terminal consists of a 400 m long and 20 m deep berth. To assess the berth capacity, the following table<br />

shows the parameters and values taken into consideration:<br />

Description Units Value<br />

Quay crane productivity T/hr 2,000<br />

Annual working days Days/yr 365<br />

Dayly working hours (3 shifts) h/day 21<br />

Berth capacity (ocupation) % 75<br />

Yard Capacity for loaded containers T/yr 11,497,500<br />

Table 4. Coal berth performance assumptions.<br />

This calculation means the berth could cater all coal traffic with only one crane, although having only one might<br />

cause difficulties to serve ships in case of malfunction.<br />

The stockyard is equipped with conveyors and stackers/reclaimers, standard equipment for this kind of terminals.<br />

The following figure shows the layout of the terminal:<br />

2.4.3. Buildings<br />

Figure 12. Coal terminal layout<br />

Some administration and control buildings will be required for the new port. The following list includes the most<br />

important ones –which have been foot printed on the drawings:<br />

• <strong>Port</strong> administration building<br />

• Police station<br />

• Fire station<br />

• Customs<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 22<br />