Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

3.2. TECHNO ECONOMIC FEASIBILITY STUDY FOR COLACHEL PORT (2010)<br />

This report was made by M/s i-maritime Consultancy Private Ltd. for Tamil Nadu Maritime Board (Ministry for<br />

Highways and <strong>Port</strong>s) in July 2010 and analyses the viability of establishing a multi-purpose commercial port,<br />

concluding that the port would only be viable if a captive thermal power plant is set up.<br />

I-maritime proposes a port on the Manavalakurichi shoreline, which, from a technical point of view, has certain<br />

issues, for example:<br />

• It is poorly protected from the swell coming from the south.<br />

• The stocking yard of container terminals are onshore while the berths are far from them and seem too small<br />

for the expected vessels.<br />

• The solution needs a large and difficult dredging.<br />

• Since the port is located in the middle of a physiographic unit between Colachel and Manavalakurichi, it<br />

would have a big adverse impact to the beach dynamics and shape.<br />

• Again, the port needs large amount of land to be acquired for terminals, which is likely to be difficult to<br />

achieve in this district.<br />

Figure 10: Location (left) and concept layout (right) for Colachel port by i-maritime Consultancy Private Ltd<br />

Inputs have been taken on traffic and financial study from this report.<br />

3.3. OUTER HARBOUR OF VOC PORT<br />

M/s i-maritime Consultancy Private Ltd prepared a Detailed Project Report for the development of Outer Harbour<br />

at VOC <strong>Port</strong> in December, 2013, and a Supplementary Report adding some considerations and comments from<br />

VOCPT in October, 2014.<br />

On February, 2015, Indian <strong>Port</strong>s Association (IPA) submitted a Report to Review and Validate the Detailed<br />

Project Report made by i-maritime. This report undertakes a detail review and proposed a new optimized layout<br />

(see figure below) and several adjustments on the design.<br />

26<br />

www.tamilri.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!