Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

PHASE 1 PHASE 2 PHASE 3<br />

ITEM UNIT RATE (Rs)<br />

AMOUNT<br />

AMOUNT<br />

AMOUNT<br />

QUANTITY<br />

QUANTITY<br />

QUANTITY<br />

(Rs.Cr.) (Rs.Cr.) (Rs.Cr.)<br />

2.2 Vertical Breakwater<br />

2.2.1 Bedding layer (50-150 kg) Cu.m 1,890.00 269,185.01 50.88 274,386.44 51.86 191,237.21 36.14<br />

2.2.2 Rock protection (1-2 t) Cu.m 3,465.00 72,115.94 24.99 71,731.07 24.85 49,993.90 17.32<br />

2.2.4 Guard blocks (36 t) Cu.m 11,970.00 15,036.00 18 0.63 0 0.44 0<br />

2.2.5 Caissons<br />

2.2.5.1 Structure (reinforced concrete) Cu.m 23,940.00 240,643.52 576.1 160,942.02 385.3 112,170.64 268.54<br />

2.2.5.2 Sinking on site L.S. 220,500,000.00 1 22.05 0.63 13.98 0.44 9.74<br />

2.2.5.3 Sand fill Cu.m 630 962,574.08 60.64 643,768.09 40.56 448,682.55 28.27<br />

2.2.6 Superstructure (Crown wall) Cu.m 12,600.00 81,967.50 103.28 41,316.08 52.06 28,795.78 36.28<br />

Total 1,124.35 611.46 439.15<br />

3 BERTHS<br />

3.1 Container berth (35 m wide)<br />

3.1.1 Concrete Piles (1500 mm) m 113,400.00 16,520.00 187.34 41,300.00 468.34 24,780.00 281.01<br />

3.1.2 Superstructure Sq.m 26,775.00 29,750.00 79.66 74,375.00 199.14 44,625.00 119.48<br />

3.1.3 Berth equipment<br />

3.1.3.1 Fenders Un 2,835,000.00 57 16.16 143 40.54 86 24.38<br />

CP1832-FR-CP-FinalReportRevised-Report-Ed1.docx 174<br />