RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

PHASE 1 PHASE 2 PHASE 3<br />

ITEM UNIT RATE (Rs)<br />

AMOUNT<br />

AMOUNT<br />

AMOUNT<br />

QUANTITY<br />

QUANTITY<br />

QUANTITY<br />

(Rs.Cr.) (Rs.Cr.) (Rs.Cr.)<br />

1 PRELIMINARIES<br />

1.1 Surveys and studies L.S. 25,200,000.00 1 2.52 0.25 0.63 0.25 0.63<br />

1.2 Site Clearance, site offices, fencing L.S. 22,050,000.00 1 2.21 1 2.2 1 2.21<br />

1.3 Temporary berthing facilities L.S. 189,000,000.00 1 18.9 0 0 0 0<br />

Total 23.63 2.84 2.84<br />

2 BREAKWATERS<br />

2.1 Rubble mound breakwater<br />

2.1.1 Core material (50-100 kg) Cu.m 1,890.00 704,839.10 133.21 134,967.32 25.51 134,967.32 25.51<br />

2.1.2 Rock (1-50 kg) Cu.m 1,890.00 16,922.31 3.2 3,933.97 0.74 3,933.97 0.74<br />

2.1.3 Rock (0.2-0.5 t) Cu.m 2,835.00 22,785.08 6.46<br />

2.1.4 Rock (0.5-1 t) Cu.m 3,465.00 49,932.29 17.3 0 0 0 0<br />

2.1.5 Rock (3-4 t) Cu.m 5,040.00 24,924.16 12.56 24,924.16 12.56 24,924.16 12.56<br />

2.1.8 Concrete cubes (5 t) Cu.m 8,820.00 3,865.17 3.41 0 0 0 0<br />

2.1.9 Accropods (2 m 3 ) Cu.m 10,710.00 3,751.84 4.02 0 0 0 0<br />

2.1.10 Accropods (3 m 3 ) Cu.m 11,340.00 33,123.28 37.56 0 0 0 0<br />

2.1.11 Superstructure (Crown wall) Cu.m 12,600.00 40,232.64 50.69 0 0 0 0<br />