28.11.2017 Views

Enayam Port

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

PHASE 1 PHASE 2 PHASE 3<br />

ITEM UNIT RATE (Rs)<br />

AMOUNT<br />

AMOUNT<br />

AMOUNT<br />

QUANTITY<br />

QUANTITY<br />

QUANTITY<br />

(Rs.Cr.) (Rs.Cr.) (Rs.Cr.)<br />

6.1.4 Shuttle Carriers Un 53,550,000.00 16 85.68 40 214.2 24 128.52<br />

6.1.5 Reach Stackers Un 31,500,000.00 2 6.3 5 15.75 3 9.45<br />

6.1.6 Terminal tractors Un 6,300,000.00 4 2.52 10 6.3 6 3.78<br />

6.2 Coal Yard<br />

6.2.1 Gantry Cranes (Quay) Un 630,000,000.00 0 0 2 126 2 126<br />

6.2.2 Stackers, reclaimers, conveyors L.S. 126,000,000.00 0 0 1 12.6 1 12.6<br />

Total 1,247.40 3,209.85 2,025.45<br />

7 BUILDINGS<br />

7.1 Admin. and Operation Buildings Sq.m 35,280.00 2,600.00 9.17 1,300.00 4.59 650 2.29<br />

7.2 Maintenance Buildings Sq.m 28,980.00 4,500.00 13.04 4,500.00 13.04 2,250.00 6.52<br />

7.3 Utility Buildings Sq.m 34,650.00 1,000.00 3.47 0 0 0 0<br />

7.4 Miscellaneous Buildings Sq.m 22,050.00 800 1.76 0 0 0 0<br />

Total 27.44 17.63 8.81<br />

CP1832-FR-CP-FinalReportRevised-Report-Ed1.docx 179<br />

www.tamilri.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!