28.11.2017 Views

Enayam Port

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

window platforms for seamless sharing of information with all stakeholders e.g. Dubai Trade and the<br />

Mirsal 2 system implemented in Jebel Ali<br />

iii.<br />

Allowing parallel loading/ unloading while vessel rummaging can save 2 – 3 hours delay<br />

• Often, 2 – 3 hours delay occurs in loading/ unloading as the process cannot be initiated until the<br />

rummaging and clearance by custom officer. In many leading ports such Customs allow the process to<br />

start in parallel, thus avoiding the time delay.<br />

• Proposed solution: Allow loading/ unloading of containers in parallel with rummaging process<br />

iv.<br />

Implementation of OCR technology versus Form 13 submission process will reduce wait times at gates<br />

• In ports where en block movement has been identified e.g. JNPT, gate movement of goods requires<br />

submission of Form 13 by CFS agent and approval by customs officer. This often leads to congestion of<br />

up to 12-18 hours at the gates.<br />

• Use of technologies like OCR can help do away with the paper form submission process, while still<br />

allowing for tracking of vehicles & containers in and out of the port.<br />

8. Hinterland road and rail connectivity (for gateway traffic)<br />

<strong>Enayam</strong> (site for Colachel port) is at a distance of 11.7 km from NH 47 that connects to both T.N. and Kerala.<br />

NH 47 further connects to NH 7 which is the main arterial route and along which most of the hinterland<br />

industries are located. Developing a road connection with NH 47 has been identified as the fastest and cost<br />

efficient way of connecting the port with the hinterland.<br />

The map below shows the existing highways and the status of their upgradation projects. NH 7 is an important<br />

corridor, which would connect the port to the hinterland industries and the Nanguneri SEZ. In order to establish<br />

connectivity with NH 7, it is vital to complete the development of the greenfield 4-lane NH-47 and the last mile<br />

connectivity to the NH-47, with the support of NHAI and State Government.<br />

34<br />

www.tamilri.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!