Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

• Quarry and construction materials shall be covered with sheets/enclosed during transportation and storage<br />

to avoid dust generation;<br />

• Dust suppression techniques (e.g. wetting down, use of all-weather surfaces, use of agglomeration<br />

additives) for roads and work areas, optimisation of traffic patterns, and reduction of travel speeds;<br />

• Exposed soils and other erodible materials should be re-vegetated or covered;<br />

• New areas should be cleared and opened-up only when absolutely necessary;<br />

• Loading, transfer, and discharge of materials should take place with a minimum height of fall, and be<br />

shielded against the wind, and consider use of dust suppression spray systems;<br />

• Hardened roads should be laid in the area to avoid dust generation due to vehicular movement;<br />

• Solid wood barriers or wind screen fabric should be used around the perimeter of construction site to<br />

avoid impact on neighbouring communities due to dust generated from construction activities;<br />

• Dust suppression techniques (e.g. wetting down, use of agglomeration additives) for roads and work areas<br />

should be applied;<br />

• Good maintenance of vehicles and equipment according to a periodical repair/revision programme;<br />

• Use of good quality fuel and lubricants;<br />

• Daily cleaning of access ways in the neighbourhood of work sites (removal of earth and sand) to prevent<br />

dust;<br />

• Collection and temporary storage of sanitary and cleaning wastes, as well as garbage, in containers;<br />

• Only Vehicles having Government license and PUC certificate for transportation of construction and quarry<br />

materials should be used;<br />

• Energy conservation measures can enhance efficient energy consumption patterns and consequently<br />

affect the GHG emissions impacts in a positive manner.<br />

If adequate measures such as sprinkling of water on haul roads around sites where clearance activities are on,<br />

covering material trucks especially those carrying sand and borrow materials etc, then the impacts can be<br />

reduced to a great extent. The main source of dust generation is due to site clearance activities, removal of trees<br />

and loading/unloading of construction material.<br />

To mitigate the dust generation, following suitable mitigation measures shall be applied:<br />

• Sprinkling of water shall be carried out.<br />

• Asphalt plants, crushers will be sited at least 1.0 km in the down wind direction of human settlement and<br />

other sensitive receptors along the project corridor.<br />

• During and after compaction of the sub grade/sub base water will be sprayed at regular interval in order<br />

to avoid dust generation.<br />

• Vehicles carrying fine and coarse aggregate should be covered with tarpaulin in order to avoid the spills<br />

on the existing road.<br />

Exhaust gas emissions are anticipated from construction plants, vehicles, etc. So in order to mitigate the exhaust<br />

gases, all the vehicles should be warranted with certificate proper maintenance of the vehicles shall be followed.<br />

Operation of the port itself is not anticipated to result in any significant air quality impacts. The following<br />

measures could mitigate the anticipated negative impacts on the ambient air quality:<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 120 120<br />