RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

PHASE 1 PHASE 2 PHASE 3<br />

ITEM UNIT RATE (Rs)<br />

AMOUNT<br />

AMOUNT<br />

AMOUNT<br />

QUANTITY<br />

QUANTITY<br />

QUANTITY<br />

(Rs.Cr.) (Rs.Cr.) (Rs.Cr.)<br />

5.1.2 Cement Bound Granular Mixture C 8/10 Cu.m 5,166.00 213,599.88 110.35 479,661.52 247.79 275,805.40 142.48<br />

5.1.3 Aggregate sub-base Cu.m 1,575.00 184,846.05 29.11 415,091.70 65.38 238,677.75 37.59<br />

5.1.4 Capping layer Cu.m 945 369,692.10 34.94 830,183.40 78.45 477,355.50 45.11<br />

5.1.5 ARMG Rail and fixtures m 44,100.00 11,748.00 51.81 26,381.00 116.34 15,169.00 66.9<br />

5.1.6 ARMG beams (Reinf. Concr.) Cu.m 23,940.00 6,408.00 15.34 14,390.00 34.45 8,274.00 19.81<br />

5.2 Multi-purpose Area 257,997.00 31,683.00 0<br />

5.2.1 Concrete C 32/40 Cu.m 7,875.00 61,919.28 48.76 7,603.92 5.99 0 0<br />

5.2.2 Aggregate sub-base Cu.m 1,575.00 28,650.00 4.51 4,752.45 0.75 0 0<br />

5.2.3 Capping layer Cu.m 945 171,900.00 16.24 28,514.70 2.69 0 0<br />

Total 347.29 633.2 358.67<br />

6 EQUIPMENT<br />

6.1 Container Terminal<br />

6.1.1 STS Cranes (Quay) Un 630,000,000.00 9 567 22 1,386.00 14 882<br />

6.1.2 A-RMG Cranes (Yard) Un 126,000,000.00 44 554.4 110 1,386.00 66 831.6<br />

6.1.3 RMG Cranes (Rail yard) Un 157,500,000.00 2 31.5 4 63 2 31.5<br />