Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

2.4. FACILITIES<br />

2.4.1. Container terminal<br />

Figure 11. Scheme for container terminal operations<br />

Its main features are:<br />

• Berth-yard transfer: Handling of containers between the quay cranes and the yard cranes is made by<br />

shuttle carriers. The STS cranes leave the container on the pavement and a shuttle carrier takes it to the<br />

water-side transfer area of the yard, or vice versa.<br />

• Container yard. An automated rail mounted gantry container crane (A-RMG) takes the container and stocks<br />

it in the yard. Whenever is needed, the crane takes it and leave it on the other side of the land-side<br />

transfer area, where a truck is waiting to be loaded. This can occur to the other direction- a truck leaves<br />

the container and the ARMG stocks it in the yard and whenever is needed the crane leaves the container<br />

o the sea side of the yard to be loaded into a ship.<br />

Usually every block is covered by two ARMG, one for the sea-side and the other for the land side.<br />

• The connectivity from the yard to outside the port is as usual in every container terminal.<br />

2.4.1.1. Berths<br />

Berths must be sized to cater the estimated handlings over it. Other berths and terminals<br />

Although there is no forecast for general cargo, a 400 m general cargo and multipurpose berth is included in<br />

the port layout. This berth will allow the container terminal to be very specialized and avoid interruptions in<br />

operations.<br />

Besides, a 200 m berth for ancillary vessels such as tugs, pilots and mooring launches is included in the<br />

facilities.<br />

2.4.2. Solid bulk terminal<br />

Coal traffic is expected to begin in 2022. A solid bulk terminal is included in Phase 2 development to cater this<br />

cargo.<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 21<br />