Tamil Research Institute<br />

RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

Dustbins shall be provided along roadside so that the road users can use them for disposal of waste materials if<br />

any. Signboards can be installed at desired locations along the roadside propagating people about the<br />

environment to keep neat and clean.<br />

5.3.2.3. Balance<br />

Activity Anticipated Impact Mitigation Measures<br />

Construction<br />

activities,<br />

workers camp<br />

and operation<br />

of terminals<br />

Increase in solid waste generation and increased<br />

pressure on existing disposal sites<br />

Reduced availability of drinking water on account<br />

of increased pressure on existing drinking water<br />

supply scheme<br />

A separate workers camp shall be established by the<br />

project developer, in which basic facilities like drinking<br />

water, sanitation facilities and sewage/solid waste<br />

management for the workers/employees of the port shall<br />

be provided. Cooking fuel will also need to be provided<br />

for by the contractor to the workers in the camp to avoid<br />

destruction of local green cover. Project shall have its own<br />

STP for treating wastewater generated in labour camps<br />

and other processes.<br />

Primary health care and basic first aid shall be provided at<br />

construction site / labour camps. Key requirements are: (i)<br />

availability of adequate number of properly stocked first<br />

aid kits (wrapped sterile adhesive dressings, individually<br />

wrapped eye pads, individually wrapped sterile wound<br />

dressings of various sizes, triangular bandages, safety pins<br />

and sterile gloves); and (ii) first aid training of staff and<br />

workers.<br />

Table 51 <strong>Enayam</strong> Alternative Waste Management. Anticipated Impact and Mitigation Measures<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 138 138<br />

www.tamilri.com