RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR<br />

DEVELOPMENT OF COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

Figure 143: Some examples of coal terminal equipment. Gantry crane (left) and stacker/reclaimer (right)<br />

The following figure shows the layout of the terminal on Phase 2, whit a total area of 9 Ha, while in Phase 3 the<br />

terminal will be duplicated to 18 Ha to be able to cater the expected coal traffic.<br />

9.6.4. Buildings<br />

Figure 144: Coal terminal layout on Phase 2<br />

Some administration and control buildings will be required for the new port. The following list includes the most<br />

important ones –which have been foot printed on the drawings:<br />

• <strong>Port</strong> administration building<br />

CP1832-FR-CP-FinalReportRevised-Report-Ed1.docx 156<br />