6.1.5. Institutional Setup of EMP and CSR Cell<br />

The EMP cell needs to be a decision making unit of the entire management mechanism. Therefore is important<br />

either to have full-fledged EMP cell with all staff or to have a lean unit with hired consultants fulltime on call.<br />

• Head of EMP and CSR cell also need to be at least on a third level of hierarchy:<br />

• Chief Executive Officer (CEO)<br />

• Chief Operating officer (COO) and <strong>Port</strong> Security Officer (PSO)<br />

• HODs of all sections<br />

• Within EMP cell both CSR section and EMP section. The CSR section need to have professional preferably<br />

an expert from the Social angle and the EMP cell must have a professional preferably a strong<br />

environmental management professional.<br />

• There must be decentralised environmental managers that will have independent or composite charges of<br />

the decentralised units.<br />

6.1.6. Administrative and Technical Setup for Environmental Management<br />

A highly qualified and experienced people in the field of Environmental Management of port shall be considered<br />

for the position of Senior Manager for Environmental Management along with adequate supporting staff. The<br />

responsibilities of the Environmental Management Team shall be as follows:<br />

• Identify environmental aspects, normal, abnormal and emergency conditions<br />

• Ensure implementation of standard operating procedures as updated from time to time<br />

• Evaluate any non-conformity to the environmental standards, as stipulated by different regulatory agencies<br />

• Ensure and implement necessary corrective actions<br />

• Establish procedures for reporting, document and record control<br />

• Establish and implement procedures for incident and near miss reporting, investigation and root cause<br />

analysis and prescribe corrective action<br />

6.2. COMPONENTS OF EMP AND CSR. MANAGEMENT ACTION PLANS<br />

The environmental impact mitigation and avoidance measures for each likely impact on the prevailing<br />

environment have been discussed in detail at the respective sections. The following Management Action Plans<br />

(MAP) encompasses both EMP and CSR plans to address all issues comprehensively.<br />

A Full detailed Environmental Management Plan and CSR should be established in the following Project<br />

Development Phases (Final Design and final ESIA Report ) Thus, according to that final design the Final EMP<br />

and CSR will clearly establish the mitigation measures to be taken, the time schedule for their implementation and<br />

the roles and responsibilities for impact mitigation and compensation<br />

From the conclusions of this Initial Environmental Examination, this section presents a preliminary Environmental<br />

Management Plan in matrix format.<br />

In the following matrix the Agency ultimately responsible for monitoring compliance has been identified. For some<br />

management objectives it is possible that more than one monitoring agency is applicable, and in these cases<br />

careful and regular communication between the agencies is recommended.<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 161 161<br />