RAPID TECHNO-ECONOMIC FEASIBILITY REPORT FOR DEVELOPMENT OF<br />

COLACHEL PORT AT TAMILNADU<br />

FINAL REPORT<br />

Nº Activity<br />

Relevant<br />

Environmental<br />

Components to be<br />

affected<br />

Likely Impacts<br />

Proposed Mitigation Measures<br />

Responsible Agency for<br />

Implementation<br />

dredging<br />

Marine Ecology<br />

<br />

OPERATIONAL PHASE<br />

Due to decrease in DO levels which effect<br />

marine ecology and disturbance to<br />

benthic communities.<br />

5 Water Supply Water resources Impact on existing water resources<br />

6<br />

7<br />

Wastewater<br />

Discharge<br />

Solid Waste<br />

Management<br />

Water Quality<br />

Groundwater and Soil<br />

quality<br />

<br />

<br />

Impact due to discharge of runoff from<br />

container storage and sewage from port<br />

and port colony premises<br />

Impact due to disposal of solid waste on<br />

ground without treatment<br />

8 Fishing activity Fishermen livelihood Impact on fishing due to vessel movement<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

conditions and modelling results quantity of<br />

dredge negligible. Maintenance dredged<br />

material will be dumped at the identified<br />

offshore disposal area for capital dredged<br />

material.<br />

Additional Environmental Monitoring<br />

Programme comprising of monitoring of<br />

marine water quality, marine sediment quality<br />

and marine ecology will be initiated one<br />

week prior to commencement of dredging and<br />

will be carried out during the dredging period.<br />

Water treatment plant, storage and distribution<br />

network developed<br />

Separate Collection and treatment for oil and<br />

grease for runoff from workshop area, truck<br />

parking etc<br />

Sewage treatment plant to be constructed<br />

within port area and port colony area<br />

An integrated solid waste management plan is<br />

proposed for port and associated facilities<br />

Composted bio-degradable waste will be<br />

used as manure in greenbelt.<br />

Other recyclable wastes will be sold.<br />

Educating the fishermen about the orientation<br />

of approach channel and movement of ships<br />

Regular Interactions will be initiated with the<br />

fishing community<br />

Conflicts if any with fishing community will be<br />

amicably resolved in all cases<br />

A fishing harbour with all the required<br />

infrastructural facilities (i.e.,landing terminals,<br />

road network, fish processing as well as<br />

auction area, ice plant, transportation<br />

Contractor/<strong>Port</strong> Authority/<br />

<strong>Port</strong> Authority/Operator<br />

<strong>Port</strong> Authority/Operator/<br />

<strong>Port</strong> Authority/Operator/<br />

<strong>Port</strong> Authority /<br />

CP1832-FR-AX-05-CP-Initial Environmental Examination-Ed4.docx AX05 - 169<br />

www.tamilri.com