Technical Requirements<br />

Non-Assignable Spaces<br />

MDF / IDF CLOSET<br />

ROOM FUNCTION<br />

This is a dedicated space which provides a controlled environment<br />

to house telecommunications equipment and connecting<br />

hardware and should be located as close to the center <strong>of</strong><br />

the building as possible.<br />

ROOM DATA<br />

Net Square Feet (ASF)<br />

Avg. No. <strong>of</strong> Occupants<br />

No. <strong>of</strong> Spaces by Type<br />

100 asf<br />

n/a<br />

2 (Eastside); 2 (Westside)<br />

TECHNICAL REQUIREMENTS<br />

ARCHITECTURAL<br />

Floor<br />

Sealed Concrete<br />

Base<br />

Rubber<br />

Walls Exposed Structure -See Notes 2, 3<br />

Ceiling Exposed Structure - See Note 3<br />

Lighting<br />

Fluorescent<br />

<strong>SA</strong>MPLE ROOM LAYOUT<br />

This diagram is included as a planning tool to ensure that the space<br />

will function as the users require within the assigned square feet. It is<br />

not intended to dictate the final design or configuration <strong>of</strong> the space.<br />

MECHANICAL / PLUMBING<br />

Temperature/Humidity<br />

Air Changes/Hour<br />

Hot Water (HW)<br />

Other<br />

Variable 55°f to 78°f @ 14 -45%rh<br />

min. per Code<br />

Cold Water (CW)<br />

Reference the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong> “Cabling<br />

Standards” prepared by the In<strong>for</strong>mation<br />

Technology Services Department <strong>for</strong> the specific<br />

requirements <strong>of</strong> this space type. ITSD should be<br />

contacted during the design phase to determine<br />

final room design, layout and location.<br />

ELECTRICAL / COMMUNICATIONS<br />

Power See Note 6<br />

Dedicated Circuits<br />

Data<br />

Other<br />

Stand-by Power<br />

FURNISHINGS, FIXTURES & EQUIPMENT<br />

NOTES (CONTINUED)<br />

Equipment Cabinet(s) cfci 4. Lighting shall not be placed directly over cable trays.<br />

5. Temperature shall be maintained between 55 degrees Fahrenheit<br />

and 78 degrees Fahrenheit. Relative humidity shall be<br />

between 14 percent and 45 percent.<br />

6. Locate two (2) dedicated 120 VAC 60 Hz outlets protected<br />

by 20 A circuit breaker directly on the cable tray above the<br />

equipment cabinet. In addition, install one (1) dedicated 120<br />

NOTES<br />

1. Reference “Code and Standards” chapter <strong>for</strong> in<strong>for</strong>mation<br />

regarding additional design requirements <strong>of</strong> this space which<br />

may not be listed here.<br />

2. One wall shall be completely covered in 3/4” fire rated plywood.<br />

Plywood shall be installed so that stamps are always visible<br />

<strong>for</strong> inspection and shall never be painted.<br />

3. Ceiling shall be 9’-0” aff. Walls and ceiling finishes shall be<br />

treated to eliminate dust. Finishes shall be light in color to<br />

enhance room lighting.<br />

VAC 60 Hz outlets protected by 20 A circuit breaker on the<br />

plywood covered wall <strong>for</strong> service providers approximately 18<br />

inches aff. Aluminum cable sheath, racks, cable trays and<br />

shelving shall be grounded per ITSD standards.<br />

7. Provide minimum 48 inches clearance between the front, rear<br />

or side <strong>of</strong> an equipped rack and a wall with communicating<br />

components on it. <strong>The</strong>re shall be a minimum 36 inches clearance<br />

between the front, rear or side <strong>of</strong> an equipped rack and a<br />

blank wall.<br />

8. All wall-mounted cabinets shall be installed so that the top <strong>of</strong><br />

the cabinet is 72 inches aff.<br />

Facility <strong>Programming</strong> and Consulting<br />

An Architectural Space Program <strong>for</strong> the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />

Final - May 2013<br />

<strong>Pre</strong>-K 4 <strong>SA</strong> Early Childhood Centers - East and Westside Centers<br />

Page 4.49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!