08.11.2014 Views

Programming Documents for Pre-K for SA - The City of San Antonio

Programming Documents for Pre-K for SA - The City of San Antonio

Programming Documents for Pre-K for SA - The City of San Antonio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• A site within the Medical Center has been discussed as one potential location<br />

<strong>for</strong> the north side center. Currently, Meade Elementary, which <strong>of</strong>fers pre-K<br />

programs, and the NISD district-wide program <strong>for</strong> immigrant students are<br />

located in this area.<br />

• Recreation and physical activity space will also be critical in the design <strong>of</strong><br />

the new facility, especially as it relates to the daycare component.<br />

• NISD has recently updated the playground standards in their Design Guide.<br />

Mike Boehmer will provide the latest in<strong>for</strong>mation regarding playgrounds to<br />

the planning team.<br />

• Linda Seewald, NISD Director <strong>of</strong> Health and Physical Education,<br />

was also referenced as a good in<strong>for</strong>mation source regarding the<br />

playground design and acceptable materials <strong>for</strong> equipment and<br />

surfacing.<br />

• At a minimum, kindergarten playgrounds are to include a swingset<br />

(8’-0”), a playscape with slides and a geodesic dome. Engineered<br />

wood fiber (EWF) materials are utilized <strong>for</strong> the equipment fall zones<br />

and the playground area surfacing. Rubber wear mats are installed in<br />

the middle <strong>of</strong> the EWF depth, under the swing seat areas and at the<br />

bottom <strong>of</strong> the slides.<br />

• Engineered wood fiber is installed at a 12-inch depth to<br />

accommodate the compacting <strong>of</strong> materials (min. 10-inch thickness<br />

required per CPSC Playground Guidelines, Pub. 325). This material,<br />

if maintained properly, will meet ADA and ASTM F1951<br />

requirements <strong>for</strong> accessibility.<br />

• NISD provides at least one concrete pathway (sidewalk) accessible<br />

route leading to the play area and a concrete transition ramp,<br />

terminating beneath the engineered wood fiber surfacing that allows<br />

<strong>for</strong> wheelchair accessibility into the playground from the accessible<br />

route.<br />

• Rick Berry, Registered Accessibility Specialist, (RAS) was<br />

referenced as a point-<strong>of</strong>-contact <strong>for</strong> playground accessibility<br />

requirements.<br />

• New Texas Accessibility Standard (TAS) guidelines may impact the<br />

playground design and should be considered in the facility planning.<br />

• NISD does not currently utilize shade canopies. However, it is a<br />

Northeast ISD requirement and should be included in the facility<br />

programming <strong>for</strong> the moment. NEISD should be able to provide the<br />

typical requirements <strong>for</strong> this feature when FP&C meets with them.<br />

• Federal guidelines <strong>for</strong> the Head Start programs should be utilized as the basis<br />

<strong>for</strong> the preliminary planning and design. This ensures that the facility will be<br />

eligible to apply <strong>for</strong> federal funds, if it desires, in the future.<br />

END OF MINUTES<br />

If any <strong>of</strong> the participants have any clarification, comments, additions or corrections to be made to these<br />

minutes, please submit them to Molly Cundari (email: mollycundari@facilityprogramming.com) within<br />

3 business days.<br />

<strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong> Early Childhood Centers <strong>of</strong> Excellence<br />

<strong>Pre</strong>liminary Meeting with NISD Page 2<br />

July 9, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!