08.11.2014 Views

Programming Documents for Pre-K for SA - The City of San Antonio

Programming Documents for Pre-K for SA - The City of San Antonio

Programming Documents for Pre-K for SA - The City of San Antonio

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical Requirements<br />

Administrative Space<br />

RECEPTION / WAITING AREA (AS-01)<br />

ROOM FUNCTION<br />

This space will serve as the reception area <strong>for</strong> each <strong>of</strong> the<br />

administrative <strong>of</strong>fice suites as identified in the space summary.<br />

An Administrative Assistant will typically monitor this space<br />

and serve as the receptionist <strong>for</strong> visitors.<br />

ROOM DATA<br />

Net Square Feet (ASF)<br />

Avg. No. <strong>of</strong> Occupants<br />

No. <strong>of</strong> Spaces by Type<br />

100 asf<br />

1 + 2 Guests<br />

1 (Eastside); 1 (Westside)<br />

TECHNICAL REQUIREMENTS<br />

ARCHITECTURAL<br />

Floor<br />

Base<br />

Walls<br />

Ceiling<br />

Lighting<br />

MECHANICAL / PLUMBING<br />

Temperature/Humidity<br />

Air Changes/Hour<br />

Hot Water (HW)<br />

Other<br />

Carpet Tile<br />

Rubber<br />

Painted Gypsum Wallboard<br />

Acoustical Tile System<br />

Fluorescent<br />

Variable 68°f to 75°f @ 50%rh<br />

min. per Code<br />

Cold Water (CW)<br />

<strong>SA</strong>MPLE ROOM LAYOUT<br />

This diagram is included as a planning tool to ensure that the space<br />

will function as the users require within the assigned square feet. It is<br />

not intended to dictate the final design or configuration <strong>of</strong> the space.<br />

ELECTRICAL / COMMUNICATIONS<br />

Power 110v/20a/1-phase - See Note 4<br />

Dedicated Circuits<br />

Stand-by Power<br />

Data See Notes 3 and 4<br />

Other<br />

FURNISHINGS, FIXTURES & EQUIPMENT<br />

NOTES (CONTINUED)<br />

(2) Guest Chairs <strong>of</strong>oi 2. Provide vision lite in entry door <strong>for</strong> visual access from the<br />

(1) End Table and / or C<strong>of</strong>fee Table <strong>of</strong>oi<br />

building corridors or adjacent spaces. Entry door to space<br />

shall be provided with secure (i.e. key card) access.<br />

(1) Standard Modular Desk <strong>of</strong>oi<br />

3. Provide (1) 2-port data outlet and (1) telephone outlet<br />

(1) Standard Movable Chair <strong>of</strong>oi (min.) to workstation; coordinate with workstation location.<br />

(1) File Cabinet <strong>of</strong>oi Building shall be equipped with wireless technology and<br />

infrastructure.<br />

(1) Computer and Monitor <strong>of</strong>oi<br />

4. Provide adequate power to workstation to operate equipment;<br />

coordinate with workstation location. Convenience<br />

(1) Telephone <strong>of</strong>oi<br />

Access to Shared Network Printer<br />

<strong>of</strong>oi duplex power outlets shall be provided along the perimeter<br />

walls at regular intervals, in accordance with Code. When<br />

locating power and data outlets, pay special attention to the<br />

possible location <strong>of</strong> equipment and furniture.<br />

5. Provide 50 to 55 footcandle (fc) <strong>for</strong> general illumination.<br />

NOTES<br />

Lighting shall have motion sensors; controls shall be located<br />

within close proximity to the entry door. Natural light into<br />

1. Reference “Code and Standards” chapter <strong>for</strong> in<strong>for</strong>mation the space is desired. Windows shall be provided with blinds or<br />

regarding additional design requirements <strong>of</strong> this space which shades to control natural light.<br />

may not be listed here.<br />

An Architectural Space Program <strong>for</strong> the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />

Facility <strong>Programming</strong> and Consulting<br />

<strong>Pre</strong>-K 4 <strong>SA</strong> Early Childhood Centers - East and Westside Centers Final - May 2013<br />

Page 4.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!