Executive Summary<br />

<strong>Pre</strong>liminary Project Cost<br />

At the time <strong>of</strong> publication <strong>of</strong> this document, a total project budget <strong>for</strong> the<br />

construction and finish-out <strong>of</strong> both the Eastside and Westside centers was<br />

not available. It is the intention that the facilities will be constructed by a<br />

developer and leased to the <strong>City</strong>. <strong>The</strong> allocated budget will be utilized <strong>for</strong><br />

tenant fit-out. <strong>The</strong> budget will continue to be reviewed regularly during<br />

the design and construction phases to determine necessary adjustments.<br />

A 1/8-cent sales tax was approved by the citizens <strong>of</strong> <strong>San</strong> <strong>Antonio</strong> in<br />

November 2012. This sales tax increase has been proposed to generate an<br />

estimated $29 million annually towards the construction, operation and<br />

maintenance <strong>of</strong> the early childhood centers. <strong>The</strong> cost <strong>of</strong> this investment<br />

is estimated to be $7.79 annually per median <strong>San</strong> <strong>Antonio</strong> household. In<br />

addition, the facilities may be eligible to receive matching state pre-Kindergarten<br />

dollars estimated at between $10 million and $11 million annually.<br />

Project Schedule<br />

<strong>The</strong> schedule which follows is preliminary and will be adjusted as the<br />

project moves further through the design phase and as the construction<br />

drawings are developed. Items which may affect schedule include funding,<br />

permitting, construction document quality, contractor bids, contractor<br />

quality, and weather.<br />

<strong>The</strong> Eastside and Westside Centers will be constructed by a developer then<br />

leased back to the <strong>City</strong>. <strong>The</strong>re<strong>for</strong>e, the schedule will be developer-driven<br />

with a substantial completion by July 2014.<br />

An Architectural Space Program <strong>for</strong> the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />

Facility <strong>Programming</strong> and Consulting<br />

<strong>Pre</strong>-K 4 <strong>SA</strong> Early Childhood Centers - East and Westside Centers Final - May 2013<br />