2. General Cable<br />

3. Mohawk/CDT<br />

4. Systimax<br />

7.2.8 Copper Riser Termination Hardware<br />

A. Rack Mountable in standard EIA 19 inch equipment rack<br />

B. Cabling will be terminated Category 5e T568B termination component.<br />

7.2.8.1 Approved Manufacturer’s<br />

1. Panduit<br />

7.3 Execution<br />

7.3.1 Installation<br />

A. Contractor work <strong>for</strong>ce, sub-contractors and material suppliers shall review and comply with<br />

all safety, security rules, codes and regulations, applicable to construction site personnel.<br />

B. Fiber cable shall be installed in one continuous segment. Splicing <strong>of</strong> fiber cables between<br />

telecom rooms is not permitted unless otherwise identified by the <strong>City</strong>.<br />

C. Coils <strong>of</strong> slack cable (1 meter) shall be provided in each fiber termination panel.<br />

D. Ten meters <strong>of</strong> cable (maintenance loop) shall be neatly coiled and secured to the wall in<br />

each telecom room.<br />

E. Label all cables as specified in Section 17730.<br />