Trays can be installed parallel to and against a wall or can be suspended from the building<br />

structure using ATR. <strong>The</strong>y can also be supported using channel stock or manufacturer specific<br />

supports.<br />

10) Install conduits.<br />

See subclause 2.2.4.2, subclause 2.2.4.3 and TIA 569-B <strong>for</strong> maximum length <strong>of</strong> conduit and<br />

bends between pull points and pull box sizing.<br />

All metal conduits installed <strong>for</strong> the placement <strong>of</strong> telecommunications cable will be bonded to<br />

the equipment grounding system.<br />

All conduits shall have a pull string installed.<br />

11) Conduit hangers.<br />

Conduits are suspended from the building structure using a variety <strong>of</strong> hangers. <strong>The</strong>se hangers<br />

are available in many sizes and types depending on the type <strong>of</strong> conduit and method used to<br />

install the hangers. Refer to the manufacturer’s specifications <strong>for</strong> use <strong>of</strong> the type and size <strong>for</strong><br />

the conduit hanger to be installed.<br />

12) Installing wireway.<br />

Wireways are different from cable trays in that they are completely enclosed pathways. <strong>The</strong>y<br />

usually feature a hinged cover or one which snaps in place. <strong>The</strong>y are available in a number <strong>of</strong><br />

sizes and shapes, depending on the manufacturer. As with cable trays, the installation<br />

methodology is directly related to the manufacturer’s guidelines. All metallic wireways<br />

installed <strong>for</strong> the placement <strong>of</strong> telecommunications cable shall be bonded to the equipment<br />

grounding system.<br />

13) Pathway documentation.<br />

<strong>The</strong> pathway shall be identified on the construction drawings and physically marked with a<br />

label that identifies it and states its origin and terminus. (See ANSI/TIA 606-A.)<br />

14) General housekeeping.<br />

It is important to clean up after a work operation when installing pathways. In general,<br />

equipment <strong>of</strong> sufficient size is required to install pathways and the materials are bulkier –<br />

thereby taking up space in the hallways and passageways <strong>of</strong> the building. This causes<br />

congestion and, if left in place, can impact the work ef<strong>for</strong>ts <strong>of</strong> others.<br />

Hangers, their associated hardware, anchors, screws, and other materials can present a safety<br />

hazard to workers and should be stored during work operations and upon completion <strong>of</strong> the<br />

day’s activities. If a work area cannot be cleaned, safety cones and barricades should be placed<br />

to prevent accidental intrusion into the work area by others until the work is complete and the<br />

area is cleaned.<br />