- Page 1:
An Architectural Space Program for
- Page 5 and 6:
Foreword Facility programming and C
- Page 7 and 8:
Table of Contents Chapter Page Exec
- Page 9 and 10:
Acknowledgements Acknowledgements A
- Page 11:
Executive Summary 1
- Page 14 and 15:
Executive Summary are under-served.
- Page 16 and 17:
Executive Summary Preliminary Proje
- Page 18 and 19:
Executive Summary An Architectural
- Page 21 and 22:
Space and Adjacency Requirements In
- Page 23 and 24:
Definitions Space and Adjacency Req
- Page 25 and 26:
Building Organization Space and Adj
- Page 27 and 28:
Detail Space Summary Space and Adja
- Page 29 and 30:
Space and Adjacency Requirements Ov
- Page 31 and 32:
Space and Adjacency Requirements wi
- Page 33 and 34:
Detail Adjacency Diagram Space and
- Page 35 and 36:
Non-Assignable Spaces Space and Adj
- Page 37:
Code and Standards 3
- Page 40 and 41:
Code and Standards Other codes and
- Page 42 and 43:
Code and Standards 3. Furniture mat
- Page 44 and 45:
Code and Standards individual activ
- Page 46 and 47:
Code and Standards ■■ ■■
- Page 48 and 49:
Code and Standards 24. One hand-was
- Page 50 and 51:
Code and Standards have no protrusi
- Page 52 and 53:
Code and Standards 47. A working sm
- Page 54 and 55:
Code and Standards 7. Tuition based
- Page 56 and 57:
Code and Standards from large expan
- Page 58 and 59:
Code and Standards 8. Doorways shal
- Page 60 and 61:
Code and Standards children’s art
- Page 62 and 63:
Code and Standards ■■ ■■
- Page 65 and 66: Technical Requirements Introduction
- Page 67 and 68: Technical Requirements Room Data Sh
- Page 69 and 70: Technical Requirements Instructiona
- Page 71 and 72: Technical Requirements Instructiona
- Page 73 and 74: Technical Requirements Instructiona
- Page 75 and 76: Technical Requirements Instructiona
- Page 77 and 78: Technical Requirements Room Data Sh
- Page 79 and 80: Technical Requirements Administrati
- Page 81 and 82: Technical Requirements Administrati
- Page 83 and 84: Technical Requirements Administrati
- Page 85 and 86: Technical Requirements Administrati
- Page 87 and 88: Technical Requirements Administrati
- Page 89 and 90: Technical Requirements Administrati
- Page 91 and 92: Technical Requirements Room Data Sh
- Page 93 and 94: Technical Requirements Professional
- Page 95 and 96: Technical Requirements Professional
- Page 97 and 98: Technical Requirements Room Data Sh
- Page 99 and 100: Technical Requirements Building Sup
- Page 101 and 102: Technical Requirements Building Sup
- Page 103 and 104: Technical Requirements Building Sup
- Page 105 and 106: Technical Requirements Building Sup
- Page 107 and 108: Technical Requirements Room Data Sh
- Page 109 and 110: Technical Requirements Exterior Are
- Page 111 and 112: Technical Requirements Room Data Sh
- Page 113 and 114: Technical Requirements Non-Assignab
- Page 115: Site Studies 5
- Page 119: Programming Estimate 6
- Page 122 and 123: Programming Estimate An Architectur
- Page 125 and 126: Preliminary Project Schedule Introd
- Page 127: Appendix 8
- Page 131 and 132: Meeting Notes City of San Antonio E
- Page 133 and 134: Meeting Notes City of San Antonio E
- Page 135 and 136: public/communal spaces, lobbies, bu
- Page 137 and 138: • Due to the nature of the commun
- Page 139 and 140: Meeting Notes City of San Antonio E
- Page 141: the longevity of the tackable surfa
- Page 144 and 145: • Mr. SanMiguel noted NISD integr
- Page 146 and 147: would not be associated with any IS
- Page 148 and 149: • It was noted at this time the p
- Page 150 and 151: • Option 1 was discussed as the i
- Page 153 and 154: Meeting Notes City of San Antonio E
- Page 155: • Currently there are no standard
- Page 158 and 159: painted with soothing colors and ha
- Page 161 and 162: Meeting Notes City of San Antonio E
- Page 163: Appendix B
- Page 166 and 167:
Table of Contents Introduction ....
- Page 168 and 169:
Executive Summary The Brainpower In
- Page 170 and 171:
THE BRAINPOWER INITIATIVE INVESTMEN
- Page 172 and 173:
Pre-‐ Kindergarten Expansion
- Page 174 and 175:
o Serve 2,800 new children and an a
- Page 176 and 177:
• All kindergarten students cityw
- Page 178 and 179:
entrepreneurial outlook needed to t
- Page 180 and 181:
Budget Outline for Major Investment
- Page 182 and 183:
Brainpower Initiative - Funds Flow
- Page 184 and 185:
Tracking Provider Progress with Ben
- Page 186 and 187:
APPENDICES 21
- Page 188 and 189:
f) Inclusion practices: Place child
- Page 190 and 191:
APPENDIX C: Texas High Stakes Testi
- Page 192 and 193:
September • CONTINUED: Series of
- Page 195:
Appendix C
- Page 203 and 204:
SYNOPSIS OF THE HEAD START CENTER D
- Page 205 and 206:
Playground H 5.3 Shaded Areas Porch
- Page 207 and 208:
Reception H 7.1.9 Furnishings Possi
- Page 209 and 210:
Classroom - Infants (Early Head Sta
- Page 211 and 212:
Classroom - Toddlers (Early Head St
- Page 213 and 214:
Classroom - Toddlers (Early Head St
- Page 215 and 216:
Classroom - Pre-School (Head Start)
- Page 217 and 218:
Laundry H/S/O Ref Item Directive M/
- Page 219 and 220:
Sickroom H/S/O Ref Item Directive M
- Page 221:
Appendix E
- Page 224 and 225:
Elementary School Design Guide Stan
- Page 226 and 227:
Elementary School Design Guide Stan
- Page 241 and 242:
07-19-2012 NISD Playground Dimensio
- Page 243:
07-19-2012 Chinning Bars - Shall ha
- Page 247 and 248:
LEED 2009 for New Construction and
- Page 249:
LEED 2009 for Core and Shell Develo
- Page 253 and 254:
Appendix G Mold and Moisture Preven
- Page 255:
Appendix H
- Page 258 and 259:
NOW THEREFORE, economically respons
- Page 260 and 261:
ARTICLE XV. INTERNATIONAL ENERGY CO
- Page 262 and 263:
pursuant to section 17 of the City
- Page 264 and 265:
Exccption: Buildings with a use cla
- Page 266 and 267:
Large property means a tract of lan
- Page 268 and 269:
SECTION 13. The City Clerk is direc
- Page 271 and 272:
City Of San Antonio Information Tec
- Page 273 and 274:
5.9 Buried Conduit.................
- Page 275 and 276:
14.1.1 Receiving Fiber Optic Cablin
- Page 277 and 278:
1. Scope 1.1 Products and Applicati
- Page 279 and 280:
d) Information within this document
- Page 281 and 282:
- Install grounding backbones & bus
- Page 283 and 284:
4. Acceptable Products 4.1 City Ins
- Page 285 and 286:
finished floor level. Fire rated Pl
- Page 287 and 288:
patch panel for Cat 5e/6 cables wit
- Page 289 and 290:
Each MDF/IDF shall have a dedicated
- Page 291 and 292:
5.8 Floor Outlets Floor boxes insta
- Page 293 and 294:
6. The jacket shall be continuous,
- Page 295 and 296:
6.2.2 Category 5e, Eight-Position M
- Page 297 and 298:
6.2.7 Multi-User Telecommunications
- Page 299 and 300:
7. Backbone Cabling Standard 7.1 Ge
- Page 301 and 302:
7.2.5 Fiber Optic Connectors - Mult
- Page 303 and 304:
8. Support Structures 8.1 General S
- Page 305 and 306:
Conduit runs tying buildings togeth
- Page 307 and 308:
0 8.2.4.7 Stub-up/Stub-out Conduits
- Page 309 and 310:
ensures minimum cable bend radii is
- Page 311 and 312:
1. Main ground source feed from the
- Page 313 and 314:
8.4.6.2 TMGB 1. The main ground sou
- Page 315 and 316:
6. The No. 6 AWG insulated ground w
- Page 317 and 318:
5. For electrically non-continuous
- Page 319 and 320:
Table 2. Minimum separation distanc
- Page 321 and 322:
9. Pulling Cable 9.1 General Backbo
- Page 323 and 324:
These individuals shall be equipped
- Page 325 and 326:
• Putty • Wrap strips • Pillo
- Page 327 and 328:
11. Cable Terminations 11.1 General
- Page 329 and 330:
11.4 Fiber Termination In telecommu
- Page 331 and 332:
12. Installation Verification Insta
- Page 333 and 334:
) Thoroughly clean the work area wh
- Page 335 and 336:
Allow for future growth in the quan
- Page 337 and 338:
Loose-tube cable is primarily used
- Page 339 and 340:
c) Try to complete the installation
- Page 341 and 342:
final mounting. Splice closures can
- Page 343 and 344:
directly onto fibers in the field w
- Page 345 and 346:
should not be performed in a dusty
- Page 347 and 348:
d) Cabling intended for use with hi
- Page 349 and 350:
19. Labels And Labeling 19.1 Visibi
- Page 351 and 352:
Appendix A: Field Test Requirements
- Page 353 and 354:
NOTE - The mandrel diameters are ba
- Page 355 and 356:
Appendix B: Calculating The Loss Bu
- Page 357 and 358:
Appendix C: Definitions, Acronyms,
- Page 359 and 360:
Braid A group of non-insulated cond
- Page 361 and 362:
Crimp The act of clamping connector
- Page 363 and 364:
Horizontal Cross-connect A group of
- Page 365 and 366:
Pair 1. Two insulated wires commonl
- Page 367 and 368:
Standard A collection of requiremen
- Page 369 and 370:
Attenuation Coefficient The optical
- Page 371 and 372:
Link, Fiber Optic A combination of
- Page 373 and 374:
C.3 Acronyms, abbreviations and uni
- Page 375 and 376:
Appendix D: Bibliography And Refere
- Page 377 and 378:
Federal and Military Specifications
- Page 379 and 380:
www.telcordia.com Bellcore GR 1503
- Page 381:
NECA 406-2003, Standard for Install