• Bart Mulcahy recommended that a Registered Communications Distribution<br />

Designer (RCDD) be engaged as early in the design process as possible to<br />

ensure the proper IT design (number and placement <strong>of</strong> rooms, cable<br />

distribution, etc.) and <strong>City</strong> standards are implemented in the building design.<br />

• Jeff Kauffmann stated that Brian Combs (Combs Consulting) is<br />

currently working with the <strong>City</strong> to develop new IT standards <strong>for</strong><br />

construction and that he would be a good choice on this project.<br />

• Combs should be invited to the meeting with Debra Dockery, the<br />

design architect <strong>for</strong> the Northside center.<br />

• It was stated that bringing <strong>City</strong> fiber to the facility at <strong>City</strong> Base West,<br />

although nearby on the Brooks site, would be cost prohibitive. Also, since<br />

this building will not be <strong>City</strong>-owned it is not a good investment. Instead, the<br />

<strong>City</strong> will lease fiber from the provider.<br />

• To ensure that the facility still meets the <strong>City</strong> standards, ITSD will<br />

need to be involved with the Southside center developer. ITSD will<br />

give the developer the standards and design, as configured by the<br />

RCDD, which will be required to be in the facility.<br />

• Mike Walker raised concerns about quality control at the Southside<br />

center since this would be a developer-driven building. ITSD does<br />

not have the staff to manage the developer’s work <strong>for</strong> quality control<br />

on a daily basis, as may be necessary. Jeff Kauffmann and Razi<br />

Hosseini stated that it may be possible to provide oversight through<br />

one <strong>of</strong> the <strong>City</strong>’s on-call services.<br />

• ITSD data and cabling standards were discussed. <strong>The</strong>y are currently in the<br />

process <strong>of</strong> being updated, although this is mainly related to the type <strong>of</strong> cable<br />

(CAT6) rather than the space, mechanical, and power requirements. Mike<br />

Mitchell will send FP&C the most current standards <strong>for</strong> inclusion in the<br />

program.<br />

• If server space is required by an outside entity, it would be preferable to<br />

include space <strong>for</strong> the rack(s) in the building MDF, rather than creating a<br />

separate closet.<br />

• <strong>The</strong> facilities will be provided with both wireless and hard-wired capability.<br />

This will allow the facilities to meet the un<strong>for</strong>eseen capacity/capability which<br />

may be required in the future as data needs change.<br />

• Offices and library computers will be hard-wired, as per standard.<br />

• Classrooms and building exterior will have wireless capability. A<br />

similar system was recently installed at Hardberger Park to create<br />

outdoor “classroom” learning environments.<br />

• A public address system may be required <strong>for</strong> this facility. One which has the<br />

capability to be multi-zone controlled is desirable. <strong>The</strong> PA will also need to<br />

have capability <strong>for</strong> broadcast on the building exterior and at playgrounds.<br />

• Budget constraints will determine how much technology is provided in the<br />

classrooms. At a minimum, conduit and infrastructure should be in place to<br />

support a wide variety <strong>of</strong> potential teaching equipment (i.e. overhead<br />

projectors).<br />

<strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong> Early Childhood Centers <strong>of</strong> Excellence<br />

<strong>Pre</strong>liminary Meeting with ITSD Page 2<br />

July 27, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!