Programming Documents for Pre-K for SA - The City of San Antonio
Programming Documents for Pre-K for SA - The City of San Antonio
Programming Documents for Pre-K for SA - The City of San Antonio
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Technical Requirements<br />
Administrative Space<br />
RECORDS STORAGE (SECURE) (HIGH DENSITY) (AS-06)<br />
ROOM FUNCTION<br />
This space type will provide storage capability <strong>of</strong> files as identified<br />
in the space summary. A high density storage system shall<br />
be installed in this location to maximize capacity <strong>of</strong> this room.<br />
Due to nature <strong>of</strong> records stored in this space, the room and<br />
files shall be secure.<br />
TECHNICAL REQUIREMENTS<br />
ARCHITECTURAL<br />
Floor<br />
Resilient Flooring<br />
Base<br />
Rubber<br />
Walls<br />
Painted Gypsum Wallboard<br />
Ceiling<br />
Acoustical Tile System<br />
Lighting<br />
Fluorescent<br />
ROOM DATA<br />
Net Square Feet (ASF)<br />
Avg. No. <strong>of</strong> Occupants<br />
No. <strong>of</strong> Spaces by Type<br />
100 asf<br />
n/a<br />
1 (Eastside); 1 (Westside)<br />
<strong>SA</strong>MPLE ROOM LAYOUT<br />
This diagram is included as a planning tool to ensure that the space<br />
will function as the users require within the assigned square feet. It is<br />
not intended to dictate the final design or configuration <strong>of</strong> the space.<br />
MECHANICAL / PLUMBING<br />
Temperature/Humidity<br />
Air Changes/Hour<br />
Hot Water (HW)<br />
Other<br />
Variable 68°f to 75°f @ 50%rh<br />
min. per Code<br />
Cold Water (CW)<br />
ELECTRICAL / COMMUNICATIONS<br />
Power 110v/20a/1-phase - See Note 5<br />
Dedicated Circuits<br />
Stand-by Power<br />
Data See Note 4 and 5<br />
Other<br />
FURNISHINGS, FIXTURES & EQUIPMENT<br />
NOTES (CONTINUED)<br />
High Density Storage System cfci 2. Verify that floor structure is adequate to support the high<br />
density storage system. Coordinate with manufacturer’s<br />
specifications.<br />
3. Entry door to space shall be provided with secure (i.e. key<br />
*Note: An outside vendor will be responsible <strong>for</strong> the<br />
installation <strong>of</strong> FF&E related to this space. Designer shall<br />
provide adequate space and infrastructure to support<br />
equipment specified <strong>for</strong> this space. Consult with vendor <strong>for</strong><br />
specifications related to this space.<br />
NOTES<br />
1. Reference “Code and Standards” chapter <strong>for</strong> in<strong>for</strong>mation<br />
regarding additional design requirements <strong>of</strong> this space which<br />
may not be listed here.<br />
card) access.<br />
4. Provide (2) 2-port data outlets and (1) telephone outlet<br />
(min.) on two perimeter walls. Building shall be equipped<br />
with wireless technology and infrastructure.<br />
5. Convenience duplex power outlets shall be provided along<br />
the perimeter walls at regular intervals, in accordance with<br />
Code. When locating power and data outlets, special attention<br />
should be paid to the possible location <strong>of</strong> equipment<br />
and furniture.<br />
6. Provide 50 to 55 footcandle (fc) <strong>for</strong> general illumination.<br />
Lighting shall have motion sensors; controls shall be located<br />
within close proximity to the entry door. This space does<br />
not require natural light. If applicable, provide windows with<br />
blinds or shades to control natural light.<br />
Facility <strong>Programming</strong> and Consulting<br />
An Architectural Space Program <strong>for</strong> the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />
Final - May 2013<br />
<strong>Pre</strong>-K 4 <strong>SA</strong> Early Childhood Centers - East and Westside Centers<br />
Page 4.19