08.11.2014 Views

Programming Documents for Pre-K for SA - The City of San Antonio

Programming Documents for Pre-K for SA - The City of San Antonio

Programming Documents for Pre-K for SA - The City of San Antonio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technical Requirements<br />

Administrative Space<br />

STAFF LOUNGE (AS-09)<br />

ROOM FUNCTION<br />

This space will serve as the dining, food storage and food preparation<br />

area <strong>for</strong> the Childcare Center administrative staff and<br />

instructors, as well as a general break area.<br />

ROOM DATA<br />

Net Square Feet (ASF) 160 asf<br />

Avg. No. <strong>of</strong> Occupants 6<br />

No. <strong>of</strong> Spaces by Type 1 (Eastside); 1 (Westside)<br />

TECHNICAL REQUIREMENTS<br />

ARCHITECTURAL<br />

Floor<br />

Base<br />

Walls<br />

Ceiling<br />

Lighting<br />

Resilient Flooring<br />

Rubber<br />

Painted Gypsum Wallboard<br />

Acoustical Tile System<br />

Fluorescent<br />

<strong>SA</strong>MPLE ROOM LAYOUT<br />

This diagram is included as a planning tool to ensure that the space<br />

will function as the users require within the assigned square feet. It is<br />

not intended to dictate the final design or configuration <strong>of</strong> the space.<br />

MECHANICAL / PLUMBING<br />

Temperature/Humidity Variable 68°f to 75°f @ 50%rh<br />

Air Changes/Hour min. per Code<br />

Hot Water (HW) X Cold Water (CW) X<br />

Other See Note 4<br />

ELECTRICAL / COMMUNICATIONS<br />

Power 110v/20a/1-phase - See Note 6<br />

Dedicated Circuits<br />

Stand-by Power<br />

Data See Notes 5 and 6<br />

Other<br />

FURNISHINGS, FIXTURES & EQUIPMENT<br />

Built-In Counter Worksurface with Upper and Lower<br />

Cabinets and Double Sink<br />

cfci<br />

Whiteboard or Tackable Wall Surface - 8 Linear Feet cfci<br />

(1) Refrigerator / Freezer w/Ice Maker <strong>of</strong>oi<br />

(1) Microwave <strong>of</strong>oi<br />

(1) Paper Towel Dispenser (Wall Mounted) cfci<br />

(1) Soap Dispenser (Wall Mounted) cfci<br />

(1) Movable Table <strong>for</strong> Six <strong>of</strong>oi<br />

(6) Standard Movable Chairs <strong>of</strong>oi<br />

NOTES<br />

1. Reference “Code and Standards” chapter <strong>for</strong> in<strong>for</strong>mation<br />

regarding additional design requirements <strong>of</strong> this space which<br />

may not be listed here.<br />

NOTES (CONTINUED)<br />

2. Provide vision lite in entry door <strong>for</strong> visual access from the<br />

building corridors or adjacent spaces. Entry door to space<br />

shall be provided with keyed lock.<br />

3. Provide sound attenuation in the walls to keep equipment<br />

noise in the room from distracting staff in adjacent workspaces.<br />

4. Provide plumbing <strong>for</strong> hot and cold water to sink and to ice<br />

maker at refrigerator.<br />

5. Provide (2) 2-port data outlets and (1) telephone outlet (min.)<br />

on two perimeter walls and at counter location. Building shall<br />

be equipped with wireless technology and infrastructure.<br />

6. Convenience duplex power outlets shall be provided along<br />

the perimeter walls and GFCI outlets at counter at regular<br />

intervals, in accordance with Code. When locating power<br />

outlets, pay special attention to the possible location <strong>of</strong><br />

equipment.<br />

7. Provide 50 to 55 fc <strong>for</strong> general illumination. Lighting shall have<br />

motion sensors; controls shall be located in close proximity to<br />

the entry door. This space does not require natural light. If<br />

applicable, provide windows with blinds or shades to control<br />

natural light.<br />

An Architectural Space Program <strong>for</strong> the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />

Facility <strong>Programming</strong> and Consulting<br />

<strong>Pre</strong>-K 4 <strong>SA</strong> Early Childhood Centers - East and Westside Centers Final - May 2013<br />

Page 4.22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!