Programming Documents for Pre-K for SA - The City of San Antonio
Programming Documents for Pre-K for SA - The City of San Antonio
Programming Documents for Pre-K for SA - The City of San Antonio
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Technical Requirements<br />
Administrative Space<br />
WORKROOM / GENERAL STORAGE (AS-07)<br />
ROOM FUNCTION<br />
This space type will provide an area <strong>for</strong> the location <strong>of</strong> shared<br />
equipment (copy, fax, etc.), departmental mailboxes, supply<br />
storage, and/or document assembly/production space. <strong>The</strong><br />
space should be designed with the flexibility <strong>for</strong> future conversion<br />
to <strong>of</strong>fice space, if necessary.<br />
TECHNICAL REQUIREMENTS<br />
ARCHITECTURAL<br />
Floor<br />
Base<br />
Walls<br />
Ceiling<br />
Lighting<br />
Resilient Flooring<br />
Rubber<br />
Painted Gypsum Wallboard<br />
Acoustical Tile System<br />
Fluorescent<br />
ROOM DATA<br />
Net Square Feet (ASF)<br />
Avg. No. <strong>of</strong> Occupants<br />
No. <strong>of</strong> Spaces by Type<br />
120 asf<br />
n/a<br />
1 (Eastside); 1 (Westside)<br />
<strong>SA</strong>MPLE ROOM LAYOUT<br />
This diagram is included as a planning tool to ensure that the space<br />
will function as the users require within the assigned square feet. It is<br />
not intended to dictate the final design or configuration <strong>of</strong> the space.<br />
MECHANICAL / PLUMBING<br />
Temperature/Humidity<br />
Air Changes/Hour<br />
Hot Water (HW)<br />
Other<br />
Variable 68°f to 75°f @ 50%rh<br />
min. per Code<br />
Cold Water (CW)<br />
ELECTRICAL / COMMUNICATIONS<br />
Power 110v/20a/1-phase - See Note 5<br />
Dedicated Circuits X Stand-by Power<br />
Data See Notes 4 and 5<br />
Other See Note 6<br />
FURNISHINGS, FIXTURES & EQUIPMENT<br />
NOTES (CONTINUED)<br />
Counter w/Upper and Lower Cabinets (one wall) cfci 2. Provide vision lite in entry door <strong>for</strong> visual access from the<br />
(1) Standard Movable Table (24” x 48”) <strong>of</strong>oi<br />
building corridors or adjacent spaces. Entry door to space<br />
shall be provided with keyed lock.<br />
(1) Networked Printer and / or Copier <strong>of</strong>oi<br />
3. Provide sound attenuation in the walls to keep equipment<br />
Laminating Machine<br />
<strong>of</strong>oi noise in the room from distracting staff in adjacent workspaces.<br />
4. Provide (2) 2-port data outlets and (1) telephone outlet (min.)<br />
on two perimeter walls and at counter location. Building shall<br />
be equipped with wireless technology and infrastructure.<br />
*Note: <strong>The</strong>re shall be a minimum clear distance <strong>of</strong> 24” between<br />
5. Convenience duplex power outlets shall be provided along<br />
lower cabinet top surface and the underside <strong>of</strong> the upper<br />
the perimeter walls and at counter location at regular intervals,<br />
in accordance with Code. When locating power and<br />
cabinets. All upper cabinets shall be a minimum clear depth <strong>of</strong><br />
12” inside to allow <strong>for</strong> storing three ring binders. If millwork is<br />
data outlets, pay special attention to the possible location <strong>of</strong><br />
lockable all locks shall be keyed to the same master key.<br />
equipment and furniture.<br />
6. Verify type <strong>of</strong> power requirements <strong>for</strong> specific copy machine<br />
NOTES<br />
and equipment; a dedicated circuit and data port may be<br />
required <strong>for</strong> copier.<br />
1. Reference “Code and Standards” chapter <strong>for</strong> in<strong>for</strong>mation<br />
regarding additional design requirements <strong>of</strong> this space which<br />
7. Provide 50 to 55 fc <strong>for</strong> general illumination. Lighting shall have<br />
may not be listed here.<br />
motion sensors; controls shall be located in close proximity to<br />
the entry door. This space does not require natural light. If<br />
applicable, provide windows with blinds or shades to control<br />
natural light.<br />
An Architectural Space Program <strong>for</strong> the <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong><br />
Facility <strong>Programming</strong> and Consulting<br />
<strong>Pre</strong>-K 4 <strong>SA</strong> Early Childhood Centers - East and Westside Centers Final - May 2013<br />
Page 4.20