• Currently there are no standards <strong>for</strong> education technology at <strong>City</strong> facilities.<br />

• Kevin Goodwin noted that it would be good to understand what types <strong>of</strong><br />

subscriptions and s<strong>of</strong>tware applications may be required by the instructors in<br />

the library, training and classroom components.<br />

• Jeff Kauffmann stated that it is very early in the process and that the<br />

administration and staff who will be able to make these decisions<br />

have not yet been recruited.<br />

• A meeting is currently in the process <strong>of</strong> being scheduled, by Rebecca<br />

Flores in the <strong>City</strong> Manager’s <strong>of</strong>fice, with local teachers to discuss the<br />

preliminary space program and adjacencies. Kevin Goodwin stated<br />

that he would like to be involved at this meeting (tentatively<br />

scheduled <strong>for</strong> 8/8).<br />

• Derek Rabey will be the security consultant <strong>for</strong> this project. Mike Walker<br />

will coordinate a meeting with him regarding this project and the security<br />

requirements.<br />

• Mr. Rabey will assist the program and design team with identifying<br />

the requirements / location <strong>of</strong> security components in these facilities.<br />

Items to discuss will include electronic locks, prox cards, CCTV,<br />

intrusion alarms, panic buttons, etc.<br />

• Mr. Rabey will also assist in determining the location <strong>of</strong> security<br />

cameras.<br />

• RFID bracelets were discussed briefly as a potential method <strong>for</strong><br />

tracking/controlling the movement <strong>of</strong> the children within the<br />

building.<br />

• Jeff Kauffmann briefly discussed the schedule <strong>for</strong> these projects. Money has<br />

been set aside <strong>for</strong> the construction <strong>of</strong> the facilities. <strong>The</strong> voters will vote in<br />

November on whether or not to increase the sales tax which would pay <strong>for</strong><br />

the maintenance and operations. If the ballot passes, construction will begin<br />

in January 2013. It will be essential that as much <strong>of</strong> the ITSD design<br />

guidelines as possible are included in the program document and available to<br />

the architect and developer when the document is handed over at the end <strong>of</strong><br />

August.<br />

• Next Steps<br />

• Mike Etienne is to contact the real estate broker to arrange <strong>for</strong> a<br />

walk-thru <strong>of</strong> the Southwest Airlines building with ITSD.<br />

• Razi Hosseini will schedule a meeting early next week with Debra<br />

Dockery to discuss the preliminary program in<strong>for</strong>mation,<br />

adjacencies, etc. in advance <strong>of</strong> the meetings on 8/8 with Peter Zanoni<br />

and the local ISD teachers. Meeting will include FP&C, Jeff<br />

Kauffmann, Bill Hensley, and ITSD.<br />

END OF MINUTES<br />

If any <strong>of</strong> the participants have any clarification, comments, additions or corrections to be made to these<br />

minutes, please submit them to Molly Cundari (email: mollycundari@facilityprogramming.com) within<br />

3 business days.<br />

<strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Antonio</strong> Early Childhood Centers <strong>of</strong> Excellence<br />

<strong>Pre</strong>liminary Meeting with ITSD Page 3<br />

July 27, 2012