5.8 Floor Outlets<br />

Floor boxes installed during the concrete pour or added to a building at a later time shall support<br />

Hubbell SystemOne 4x4 applications. Raised floor application shall support Hubbell Recessed<br />

Application<br />

5.9 Underground Conduit<br />

Conduit runs tying buildings together shall be buried at a depth <strong>of</strong> 36” and minimum <strong>of</strong> one 4” conduit<br />

placed in trench (actual conduit count will be determined by ITSD). This conduit shall be packed with<br />

four 1” inner duct each having a different color. <strong>The</strong>re shall be 4” <strong>of</strong> flowable fill on top <strong>of</strong> the conduit<br />

and a caution marker tape placed in the trench 10” below the finished grade. A metallic wire shall be<br />

placed in the 4” conduit to provide a means <strong>of</strong> locating the pathway at a later date.<br />

5.10 Aerial Cable<br />

All aerial cables shall have a clearance <strong>of</strong> 18’ and shall have a ¼” messenger attached to the cable <strong>for</strong><br />

support. All dead end or corner poles shall have down wire guides to relieve pole tension. Proper<br />

weather head and attachment points shall be required when cable enters a building. All building<br />

penetrations shall be sealed to prevent water and insect access.<br />