14.11.2012 Views

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

sepam 20 user manual - Schneider Electric

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6<br />

Installation Safety instructions<br />

Before starting<br />

6/2<br />

This page contains important safety instructions that must be followed precisely<br />

before attempting to install, repair, service or maintain electrical equipment. Carefully<br />

read and follow the safety instructions described below.<br />

DANGER<br />

HAZARD OF ELECTRIC SHOCK, ELECTRIC ARC, BURNS OR<br />

EXPLOSION<br />

b Only qualified personnel should install this equipment. Such work should be<br />

performed only after reading this entire set of instructions.<br />

b NEVER work alone.<br />

b Turn off all power supplying this equipment before working on or inside it.<br />

b Always use a properly rated voltage sensing device to confirm that all power<br />

is off.<br />

b Before performing visual inspections, tests, or maintenance on this<br />

equipment, disconnect all sources of electric power. Assume that all circuits<br />

are live until they have been completely de-energized, tested and tagged. Pay<br />

particular attention to the design of the power system. Consider all sources of<br />

power, including the possibility of backfeeding.<br />

b Beware of potential hazards, wear personal protective equipment, carefully<br />

inspect the work area for tools and objects that may have been left inside the<br />

equipment.<br />

b The successful operation of this equipment depends upon proper handling,<br />

installation, and operation. Neglecting fundamental installation requirements<br />

can lead to personal injury as well as damage to electrical equipment or other<br />

property.<br />

b Handling this product requires relevant expertise in the field of protection of<br />

electrical networks. Only competent people who have this expertise are<br />

allowed to configure and set up this product.<br />

b Before performing Dielectric (Hi-Pot) or Megger testing on any equipment in<br />

which the relay is installed, disconnect all input and output wires to the relay.<br />

High voltage testing can damage electronic components contained in the<br />

Sepam unit.<br />

Failure to follow these instructions will result in death or serious injury.<br />

PCRED301005EN - 06/<strong>20</strong>08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!