7<br />

Commissioning Checking phase voltage input<br />

connections<br />

7/28<br />

DE52246<br />

Description<br />

Check to be carried out for Sepam B21 or B22.<br />

Procedure<br />

1. To apply a phase-to-neutral voltage to the phase 1 voltage input, connect the<br />

single-phase voltage generator to the test terminal box using the plug provided, in<br />

accordance with the diagram below:<br />

2. Turn on the generator.<br />

3. Apply the VT secondary rated phase-to-neutral voltage (Uns/3).<br />

4. Use the SFT2841 software to check that the phase-to-neutral voltage V1 is equal<br />

to the VT primary rated phase-to-neutral voltage (Unp/3).<br />

5. If the residual voltage is calculated by taking the sum of the 3 voltages, use the<br />

SFT2841 software to check that the residual voltage value is approximately equal to<br />

the VT primary rated phase-to-neutral voltage (Unp/3).<br />

6. Turn off the generator.<br />

7. Proceed in the same way for the other 2 phase voltage inputs.<br />

8. At the end of the test, put the cover back on the test terminal box.<br />